NYC 9/11 Public Portal Document
SECTION 02220
EXCAVATION AND BACKFILLING
PART 1 - GENERAL
I
1.01 DESCRIPTION "'•I
A. Work Included: Excavation, backfilling, filling, grading and related work
as required by the Drawings and as specified herein.
B. Related Work Described Elsewhere:
i Section 01030
5^
1. Subsurface conditions.
1j 2. Testing laboratory services. Section 01400
!
3. Temporary faci1ities and controls Section 01500 ' *
4. Traffic control. Section 01570
5. Sheeting, bracing and underpinning. Section 02150
’ll
1.02 DEFINITIONS -'-a
A. Earth Excavation: The removal of all surface and subsurface materials of 4
whatever nature encountered and not classified as rock as defined below,
6. Rock: a
l. Hai*d ledge rock in solid beds or masses in its natural bed, which in,the|
opinion of the Engineer, can be removed only by blasting, drilling,
wedging or use of pneumatic tools, or by other methods ordinarily used
i to remove hard ledge rock.
2. Boulders over one cubic yard in volume.
•-.-J
C. Removal of materials which can be loosened with a pick or backhoe,'frozen
r materials, soft,laminated shale or hardpan, pavements, curbs, and similar
materials shall be classified as earth excavation.
I
D. "Maximum Density": The maximum dry weight in pounds per cubic foot obtained \
in a soil when tested in accordance with ASTM DI557, Method C.
E. "Optimum Moisture Content": The percentage of water required to achieve the,
A maximum density of the soil when tested in accordance with ASTM 0 1557 '
Method C. : / i / ' i
I F. "Percent Density": The density of compacted layer expressed as a percentage
of the maximum density of the material.
1.03 SUBMITTALS
} A. General: Comply with provisions of Section 01300.
I
Contract 02220-1 Excavation and
1-02-21064-0-0 Backfilling
NYC-WTC_000165808