I GENERAL EXCEPTIONS: RE: ALL WORK REQUIRING STREET EXCAVATIONS
Due to the possibility of underground utilities, existing water mains, pipe lines, fiber optic cables, telephone lines, relocation & replacement of existing gas mains, conduit ducts, rock excavation, dewatering removal of existing soil determined" NOT SUITABLE FOR. BACKFILL" by the NYCDOT or NYCDEP and furnishing suitable soil, contaminated soil removal & disposal, etc., we hereby take exception to and accept absolutely no responsibility for the cost of relocating these utilities and performing any additional work in order to perform the installation required by our contract. We will however, cooperate in every way with the governing utility to negotiate an amicable means for these utilities to be relocated by their forces, or by our forces subsequent to an agreed change order in writing prior to beginning any additional work.
Dewatering and rock excavation if required is not included in this proposal and if required will be performed by our forces and paid for on a time and materials basis or another method acceptable to both parties.
In the event a change order is required and can not be negotiated at the time it is discovered and we are required to close up any excavations, there will be an additional charge for remobilization of our forces when an agreed change order has been signed both parties.Please be awaie the job will not continue until the additional work authorization is signed. t . i Contractor: JCC CONSTRUCTION CORPORATION Contractor Signature; David Cannizzaro Print Name & Title: David Cannizzaro/Prcsidcnt Date;
Agreed & Accepted by; Print Name & Title; Dare;
CITY_21MC1OO_OO3259181
NYC-WTC_000205171
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000182199
Contractual document outlining exceptions and additional costs for street excavations involving underground utilities.
1 shared topics · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
2 shared non-person entities · similarity 0.922
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
2 shared non-person entities · similarity 0.921
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · 1 shared topics · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
2 shared non-person entities · 1 shared topics · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
2 shared non-person entities · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · similarity 0.916
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · similarity 0.916
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · similarity 0.916
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093241
Agreement between the City of New York and a landowner regarding the removal of foreign material from building facades near the former World Trade Center.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118585
Final notice letter regarding WTC debris on exterior surfaces of 45 Broad Street dated September 3, 2002.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000182199
Contractual document outlining exceptions and additional costs for street excavations involving underground utilities.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.948 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
Similarity score 0.942 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.942 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
NYC-WTC_000182199
Contractual document outlining exceptions and additional costs for street excavations involving underground utilities.
Similar indexed content
NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
Similar indexed content
NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.