Excavation and backfilling specifications, 10th Ave Tunnel

Machine-extracted title · confidence 95%

Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.

NYC-WTC_000165808–000165821

Folder label: “North Access Connection, AMTRAK 10th Ave. Tunnel

Page image
Scanned page image, NYC-WTC_000165809
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

B. Excavation Procedure: Submit a detailed outline of intended excavation procedure for the Engineer's information. This submittal will not relieve the Contractor of complete responsibility for the successful performance of intended excavation methods. C. Sheeting, Shoring, and Bracing: Submit for the Engineer's information a detailed plan of intended sheeting, shoring and bracing, decking, underpinning, and other temporary not otherwise provided for in Sections 01519 or 02150, and signed by a licensed Professional Engineer. This submittal will not relieve the Contractor of complete responsibility for the successful performance of the intended methods. 0. Procedures at Restricted Area: Submit proposed procedures at restricted area over Amtrak tunnels as specified in this Section. E. Product Data: Submit manufacturer's specifications, performance characteristics and operating instructions for compaction equipment. F. Backfil 1 Material: For each backfill material used, submit laboratory test results for moisture - density relationships, per ASTM D 1557 Method C. 1.04 JOB CONDITIONS A. Barricade open excavations and post with warning lights those excavations occurring on property adjacent to or with public access. Operate warning lights during hours from dusk to dawn each day and as otherwise required. B. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by excavation and backfill operations. Coordinate as required with work specified in Sections 01519 and 02150. C. Comply with provisions of Section 01500 for temporary controls. u. Comply with all other restrictions specified in this Section. PART 2 - PRODUCTS 2.01 MATERIALS A. Common Backfill Material: Acceptable material as approved by the Engineer free from organic matter products of demolition, and other deleterious substances, and containing no rocks or lumps over 6 inches in greatest dimension except where otherwise approved by the Engineer. To the extent that it is available obtain common backfill material from excavation operations. If sufficient suitable materials are not available to meet backfilling requirements, obtain the required material from outside sources at no additional cost to the Authority. 1. Earth excavation may contain excess moisture in its natural state or may take on excess moisture during handling and stockpiling. Manipulation

Contract 02220-2 Excavation and 1-02-21064-0-0 Backfilling

NYC-WTC_000165809

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165809Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →