Contract LT-246 plans for 39th Street water line replacement

Machine-extracted title · confidence 90%

Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.

NYC-WTC_000165271–000165288

Folder label: “LINCOLN TUNNEL W. 39TH STREET CONTRACT N. LT - 246 MANHATTAN

Page image
Scanned page image, NYC-WTC_000165282
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

3.04 PREPARATION

A. Prior to placing backfill compact existing surface as specified for compaction of each laeyr of backfill.

B. Do not place backfill until the Engineerhas inspected and approved the construction and directed when backfill may be placed .

C. Remove all teraproary structures, sheet pile's, sheeting, bracing and forms and all organic materials and debris of everry nature taking care in the removal of sheet piling, sheeting and temporary supports not to cause movement of adjacent ground or structures or create the danger of a sIide .

3.05 PLACING AND COMPACTION OF BACKFILL

Backfill shall be palced in strict accorance with paragraph B of 4.11.6 of Section 4.11 of the "Department of Highways, City of New York Standard Specifications" as quoted hereinbelow:

"B. Filling shall be carefully deposited and spread by approved methods in uniform layers not exceeding twelve (12) inches depth, extending across the entire width of fill, each layer being thoroughly compacted to the satisfaction of the Engineer before a successive layer is deposited. Compac­ tion equipment shall be approved by the Engineer before it is placed in use and shall be capable of exerting a pres­ sure equivalent to two hundred and fifty (250) to three hundred (300) pounds per inch width of compression roll, or an equivalent pressure if other than smooth wheel or pneumatic tired rollers are permitted.

In areas inaccessible to power rolling or adjacent to con­ struction which may be damaged, other types of approved compaction equipment may be used.

When directed the filling shall be further compacted by wetting as required.

Filling shall be carried up uniformly on all sides of structures and thoroughly tamped."

3.06 RESTORATION OF PAVEMENT

A. Place concrete as shown on the Contract Drawing and allow to cure 72 hours before placing asphalt pavement.

lO

NYC-WTC_000165282

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165282Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165268 · Box DEP Box 44

A cover sheet or index page for documents related to the West 39th Street contract involving the replacement of infrastructure.

Filed in the same folder

NYC-WTC_000165112 · Box DEP Box 44

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

Similar indexed content

Compare copies and versions →