Contract LT-246 plans for 39th Street water line replacement

Machine-extracted title · confidence 90%

Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.

NYC-WTC_000165271–000165288

Folder label: “LINCOLN TUNNEL W. 39TH STREET CONTRACT N. LT - 246 MANHATTAN

Page image
Scanned page image, NYC-WTC_000165281
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2. The provision for material passing the #4 sieve con­ sisting entirely or in part of natural processed sand is dele ted.

3. The use of blast furnace sdlag will not be permitted.

B. Do not use aggregate from any source that does not conform to the approved sample from that source.

2.04 Steel plates shall be a minimum of one inch (1") thick.

2.05 WIRE MESH-ASTM A185

Wire sizes are expressed in gauge numbers of the United States Steel Wire Gauge. Mesh shall be furnished in rolls.

PART 3 - EXECUTION

3.01 EQUIPMENT

Mechanical tampers: Model AVS1900 as manufactured by J.I.Case/ Tenneco Co., Model RVS-5 as manufactured by Jackson Vibrators, Inc., TVR-15 as manufactured by Koehring-Master Division, or an approved eq'ual.

3.02 EXCAVATION

A. Excavate to depths required by the Contract Drawing in such manner as not to disturb subbase below such depths.

B. Remove existing pavement, concrete, and all other material encountered within limits of excavation.

C. Around and adjacent to existing structures, pipes and con­ duits, if any, which are to remain in place, perform excava­ tion without damage to or movement of same and where excava- tion is to be performed under such structures, pipes and conduits , support them, as approved by the Engineer, in a manner to insur uninterrupted operation of the supported i terns .

3.03 DISPOSAL OF EXCAVATED MATERIAL

Dispose of all debris and all excavated material unsuitable for or in excess of that reuqired for backfill away from the con- strue tion site .

7

NYC-WTC_000165281

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165281Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165268 · Box DEP Box 44

A cover sheet or index page for documents related to the West 39th Street contract involving the replacement of infrastructure.

Filed in the same folder

NYC-WTC_000165112 · Box DEP Box 44

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

Similar indexed content

Compare copies and versions →