NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
1 shared non-person entities · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
NYC-WTC_000165271–000165288Folder label: “LINCOLN TUNNEL W. 39TH STREET CONTRACT N. LT - 246 MANHATTAN”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
SECTION 2B
EXCAVATION, BACKFILL AND PAVEMENT RESTORATION
PART 1 - GENERAL
1.01 GENERAL REQUIREMENTS The work under this section consists of excavating, backfilling and rstorating pavement and sidewalk as shown on the Contract Drawings.
1.02 JOB CONDITIONS Protect excavations as follows:
A. Prevent water from entering excavated areas.
B. Dispose of water in manner such as not to cause injury to the public health or damage to public or private property.
C. If underlying soil is weakened or disturbed, replace it as directed by the Engineer.
D. Shut excavation as necessary and as approved by the Engineer to secure sides against movement.
PART 2 - PRODUCTS
2.01 BACKFILL MATEIRAL A. Use clean sand, gravel, or a mixture of these, with no organic matter.
B. Use material excavated at construction site which satisfies above requirements.
2.02 CONCRETE, Class D-18, and Asphalt concrete shall conform to the requirements of Divisions III and IV of the "Standard Specifica tions, Department of Highways, The City of New York".
2.03 DENSE GRADED AGGREGATE
A. Dense graded aggregate shall conform to all the requirements of the "New Jersey Interagency Engineering Committee - Standard For Dense Graded Aggregate Base Course", with the following exceptions:
1. Dense graded aggregate shall be quarry processed, quality controlled, crushed dolomitic limestone, gneiss, or traprock.
$
NYC-WTC_000165280
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
1 shared non-person entities · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
1 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
1 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
1 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115777
Agreement between the City of New York and a landowner for cleaning foreign material from 1 Park Row exterior areas.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099547
Agreement between the City of New York and a landowner to remove foreign material from building exteriors near the former World Trade Center site.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112508
A license agreement between the City of New York and a landowner to remove foreign material from building exteriors near the World Trade Center site.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102041
FAX cover sheet or transmission log from DEP Box 35 regarding 15 Maiden Lane.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128053
Agreement between the City of New York and a landowner regarding WTC debris cleanup at 143 Fulton Street.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115479
Application for a license agreement between the City of New York and a landowner to clean exterior areas at 23 Park Row.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118384
Agreement between the City of New York and 60 Broad Street LLC for removing foreign material from building exteriors.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.954 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.944 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Contract documentation for the Lincoln Tunnel West 39th Street project located in Manhattan.
Filed in the same folder
A cover sheet or index page for documents related to the West 39th Street contract involving the replacement of infrastructure.
Filed in the same folder
NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
Similar indexed content
NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
Similar indexed content
NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
Similar indexed content