NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
1 shared non-person entities · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
NYC-WTC_000165271–000165288Folder label: “LINCOLN TUNNEL W. 39TH STREET CONTRACT N. LT - 246 MANHATTAN”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
e) Product Type A, Trans Lite, as manufactured by Case 11 Company. f) Nightflasher Model No. NF-PST or Paralta Model No. 7000 as manufactured by Royal Ind ustries-Signa1 Division. 2. Fixtures shall be equipped with Stimsonite 781H or 94H amber lens or an approved equal.
B. Heavy timbers for barricades shall be Dense IND 50 Southern Yellow Pine or construction Douglas Fir. Southern Yellow Pine shall conform to the requirements of Paragraph No. 316 of the Standard Grading Rules for Southern Pine Lumber of the Southern Pine Inspection Bureau (Effective June 1, 1956). Dougls Fir shall conform to the requireraenLs o f Paragraphs Nos. 123-b and 124-b of the Standard Grading Dressing Rules for Douglas Fir, Sitka Spruce, West Coast Hemlock and Western Red Cedar Lumber of the West Coast Lumbermen's Association.
C. Where traffic guides are required, they shall be 26 inches high; all rubber molded in one piece, combined 3 inch O.D. post and 6-1/2 inch diameter by 5/8 inch thick base disc; tapered post wall thickness for shock resistance; post painted Highway orange inside and out to prevent ozone attack; top of base and outside and inside of posts shall be coated with neutral rubber lacquer to prevent fading; reflectorization shall be by means of 4 inch wide white reflective sleeves, one secured at the bottom of the post immediately above the base and one secured at the top of the post. Traffic guides to be as manufactured by Interstate Division of Technibuilt Corporation or approved equal. Traffic guides to be affixed to the timber barricade with epoxy and/or nails as directed by the Engineer.
2.02 PAINT MATERIALS
Paint shall be manufactured by Sherwin-Williams Co. or approved equal and shall be as follows:
1. Primer - Hi-Level exterior undercoated B46W31. 2. Paint - (a) International Orange B42E1. (b) White B53W1O.
PART 3 - EXECUTION
3.01 MAINTENANCE
All barricades and lights shall be approved by the Engineer. The Contractor shall maintain them in a condition deemed satis factory to the Engineer.
7
NYC-WTC_000165279
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
1 shared non-person entities · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
1 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
1 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
1 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115777
Agreement between the City of New York and a landowner for cleaning foreign material from 1 Park Row exterior areas.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099547
Agreement between the City of New York and a landowner to remove foreign material from building exteriors near the former World Trade Center site.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112508
A license agreement between the City of New York and a landowner to remove foreign material from building exteriors near the World Trade Center site.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102041
FAX cover sheet or transmission log from DEP Box 35 regarding 15 Maiden Lane.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128053
Agreement between the City of New York and a landowner regarding WTC debris cleanup at 143 Fulton Street.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115479
Application for a license agreement between the City of New York and a landowner to clean exterior areas at 23 Park Row.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118384
Agreement between the City of New York and 60 Broad Street LLC for removing foreign material from building exteriors.
1 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.923 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.922 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Similarity score 0.920 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.919 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.918 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166793
Engineering calculation sheet for beam column design addressing lateral torsional buckling at World Trade Center.
Similarity score 0.917 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Contract documentation for the Lincoln Tunnel West 39th Street project located in Manhattan.
Filed in the same folder
A cover sheet or index page for documents related to the West 39th Street contract involving the replacement of infrastructure.
Filed in the same folder
NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
Similar indexed content
NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
Similar indexed content
NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
Similar indexed content