NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 321 pages

Asbestos and lead survey report cover, 130 Cedar Street, July

Machine-extracted title · confidence 100%

Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.

NYC-WTC_000125204–000125524

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125216
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos and Lead Paint Inspection Report for 130 Cedar Street, New York, NY 10006

• 9. Perimeter flashing (tar) at 2"d floor stairwell #2 rear landing, main roof and terrace roof from 10-12th floors 10. Electrical wire insulation and panel board throughout building 11.Interior boiler access door frame caulk 12. Elevator break pads 13.Floor tiles and mastic 14. Ceiling skimcoat 15. Wail plaster 16. Wall skimcoat plaster 17. Carpet mastic 18. Floor leveling linoleum 19. Interior fan unit caulk 20. Window lintel caulking 21. Cap flashing caulking 22.Roof membrane 23. Flashing tar at roof perimeter and on bulkheads 24. Tar paper over ply wood at main roof 25.Pitch pocket tar 26.Spandrel beam flashing 27. Skylight caulking/tar

2.5 RECOMMENDATIONS FOR ACM:

All ACM that will be impacted by the renovation should be removed prior to work. Section 56-1.9 (e) of the New York State Department of Labor Industrial Code Rule 56 Asbestos Regulations states that:

"if a building survey finds that a building to be demolished contains asbestos or asbestos containing material as defined in section 56-1.4 of this Subpart, no bids shall be advertised nor contracts awarded nor demolition work commenced by any owner or agent prior to completion of an asbestos remedlation contract performed by a licensed asbestos contractor, In conformance with all standards set forth in this Part (rule)".

Abatement activities must be conducted In compliance with all applicable regulations, standards and generally accepted environmental and safety practices including Federal OSHA (29 CFR 1926.58), EPA NESHAPS (40 CFR Part 61), and TSCA Title II AHERA/ASHARA (40 CFR Part 763) Asbestos Regulations and the New York State Department of Labor Industrial Code Rule 56.

Prepared for Masterworks Development Corp. By JLC Environmental Consultants, Inc. Project No. 04-3271 Page 11

NYC-WTC 000125216

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125216Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →