Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125620
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY

b. Fixtures must be thoroughly HEPA vacuumed and wet wiped.

c. Clean fixtures should be protected with two layers of 6-mil fire retardant polyethylene sheeting during the removal activities.

8.0 Asbestos Containing Material Removal

8.1 Roof Membrane, Perimeter Flashing, Flashing Tar, Parapet & Bulkhead Tar, Pitch Pocket and Tar Paper over Plywood Removal:

Removal of ACM on the roof shall be performed utilizing DEP Attachment FR "Procedures for Use of Foam or Similar Viscous Liquid in Removal of Asbestos Containing Roofing Material (ACRM) in New York City".

Preliminary examination shall be conducted and precautions taken to prevent damage to the interior of the building and to ensure no adverse effect on the structural stability of the roof due to abatement activity.

2. Abatement shall not be carried out during adverse weather conditions (e.g. precipitation, heavy winds, etc.).

3 The work area on the roof shall be cordoned off and only authorized persons shall have access to the work area. In addition, electric power in the work area shall be shut down and isolated.

4. Movable objects shall be removed from the work area or kept in place and wrapped in one (1) sheet of 6-mil polyethylene. Fixed objects including perimeter walls, bulkheads, cooling towers, ducts and other rooftop appurtenances shall be covered in one sheet of plastic to a minimum height of 6 feet.

5. The worker decon unit shall be constructed at, an entry/exit from each work area in accordance with 15 RCNY § 1-117, with at least a shower room and a clean room. In addition to the shower head(s), the shower room shall be equipped with a flexible hose for waste decontamination (for removal of less than 1,000 square feet). For more than 1,000 square feet of removal, a separate waste decontamination facility as per 15 RCNY § 1-118 shall be located at an entry/exit from each work area.

6. Remote decontamination facilities will be considered however a variance must be requested from 15 RCNY § 1-117(a) and, also from 15 RCNY § 1-118 (if more than 1,000 square feet will be removed).

7. The remote holding area for the asbestos containing waste shall comply with Title 16, Chapter 8, Rules of the City of New York. (16 RCNY 8 et seq.).

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 42

NYC-WTC 000125620

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125620Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →