NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
9 shared non-person entities · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
NYC-WTC_000127738–000127777Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
• Scaffolding (29 CFR 1926.450) i • Ladders (29 CFR 1926.1053) • Personal Fall Arrest Systems (29 CFR 1926.500 and .502) • Ear Protection (29 CFR 1926.101) • Cranes and Derricks (29 CFR 1926.550) • Materials Hoists, Personnel Hoists and Elevators (29 CFR 1926.552) • Demolition (29 CFR 1926.850) • Welding/Cutting on surfaces covered by protective coatings (29 CFR 1926.354) • Excavation (29 CFR 1926.650) • Lead (29CFR 1926.62) • Asbestos (29 CFR 1926.1101) • Cadmium 1926.1127 • Powered Platforms for Building Maintenance, 29 CFR 1910.66 • Hazardous Waste Operations and Emergency Response, 29 CFR 1926.65
2.2.4 Chemical Hazards
A chemical hazard that may be encountered during this project is asbestos. Based upon the most recent pre-demolition asbestos survey conducted by Airtek environmental Corp., approximately 50 linear feet of friable, and 400 square feet of non-friable asbestos- containing material has been identified. In addition, WTC dust with assumed varying concentrations of some COPCs, has been identified during visual inspection of the site. Therefore, the Contractor shall ensure that all site employees receive the required training concerning asbestos as well as all applicable Hazard Communication training.
In addition, personnel who have the potential to disturb ACBM shall be trained concerning the procedures to be used and requirements for notifications in accordance with federal, state and local regulations. Personnel who handle ACBM on this job shall have the required documented training and certificates. Each employee involved in abatement activities must have completed City of New York asbestos training, shall be a certified asbestos worker and/or supervisor by the City of New York, and shall be certified asbestos handler and/or supervisor by the New York State Department of Labor. Additionally, personnel who will conduct cleaning and abatement activities must have additionally received the required 40-hour training as outlined by 29 CFR 1910.120(a) (i) (HAZWOPER requirement) and appropriate annual refresher training as required. This HAZWOPER training requirement may be removed, should sampling indicate training requirement downgrade is appropriate. Training, medical and license documentation for each Subcontractor employee shall be verified by the HASP AM prior to start of work by the Subcontractor.
2.2.4.1 Additional Identified Chemicals
Other chemicals identified as potential contaminants that may be encountered during the initial site cleaning activities are PAHs, dioxins, cadmium, nickel, barium, chromium, zinc, manganese, copper, beryllium, PCBs, mercury, copper, zinc, cristobalite and quartz.
The Copper Group —133-135 Greenwich Street & 21-23 Thames Street Airtek Project 05-0710 - Phase I HASP s-s-os Page 18 of 40
NYC-WTC 000127755
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
9 shared non-person entities · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
35 shared non-person entities · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
23 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
11 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
23 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
41 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
13 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
11 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
22 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
17 shared non-person entities · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗22 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000148621
Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.
Cited alongside this record in an Ask answer