NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/BINDER - PHASE 1 DECONTAMINATION PLAN
Document / 40 pages

Health and Safety Plan, June 2005

Machine-extracted title · confidence 100%

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

NYC-WTC_000127738–000127777

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127739
OCR text

OCR status: junk · source: pdftotext

NYC 9/11 Public Portal Document

TABLE OF CONTENTS •

INTRODUCTION.........................................................................................................

1.1 BACKGROUND .................................................................................................... 2

1.2 SITE DESCRIPTION ............................................................................................ 3

1.3 PURPOSE............................................................................................................... 4

1.4 OBJECTIVES......................................................................................................... 5

2.0 HEALTH AND SAFETY PROCEDURES ............................................................. 6

2.1 PERSONNEL RESPONSIBILITIES...................................................................... 7 2.1.1 Contractor ................................................................................................... 8 2.1.2 Contractor's Site Safety Officer (CSO) 2.1.3 Owner's Environmental Consultant 2.1.2 Subcontractors............................................................................................. 8

2.2 HEALTH AND SAFETY HAZARD ANALYSIS AND RISK ASSESSMENT. 12 • 2.2.1 Preliminary Evaluation.............................................................................. 12 2.2.2 Task Hazard Analysis . . 12 2.2.3 Physical Hazards....................................................................................... 26 2.2.4 Chemical Hazards ..................................................................................... 27 2.2.4.1 Additional Identified Chemicals ............................................. 28 2.2.5 Biological Hazards.................................................................................... 29 2.2.5.1 Insects ..................................................................................... 29 2.2.5.2 Rodents.................................................................................... 29 2.2.5.3 MoldlFungi ............................................................................. 29

2.3 ENGINEERING CONTROLS.............................................................................. 30 2.4 ADMINISTRATIVE CONTROLS AND WORK PRACTICES.......................... 30 2.5 PERSONAL PROTECTIVE EQUIPMENT (PPE) .............................................. 31 2.5.1 Basic PPE Requirements........................................................................... 32 2.5.2 Level C PPE.............................................................................................. 32 2.5.3 Level B PPE.............................................................................................. 33 2.5.4 Level A PPE.............................................................................................. 34 2.6 SAFETY EQUIPMENT........................................................................................ 34 2.6.1 Respiratory Protection Program................................................................ 34 2.6.1.1 Respirator Testing................................................................... 35 2.6.1.2 Respirator Inspection, Sanitization, and Maintenance........... 36 2.6.2 Medical Response Equipment................................................................... 36 2.7 PERSONAL AIR MONITORING........................................................................ 37 • 2.8 SITE CONTROL .................................................................................................. 38

The Copper Group —133-135 Greenwich Street & 21-23 Thames Street Afrtek Project 05-0710 - Phase I HASP 6-8-os Page 2 of 40

NYC-WTC 000127739

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127739Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →