machine-extracted · confidence unavailable · Check page ↗Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
NYC-WTC_000127738–000127777Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
• 1. The Contractor shall have a Site Safety Manager (CSO) on-site during the project on a full time basis for the entire duration of on-site field activities. If operations are performed during more than one work shift per day, a qualified Contractor Site Manager shall be present for each shift.
2. The CSO shall have authority to stop any and all work activities if unacceptable health and safety conditions exist or if actions occur that may affect safety and health conditions for personnel or the environment.
3. The CSO shall act as the primary contact during any on-site emergency situation.
4. The CSO shall conduct accident investigations and prepare accident reports, prepare and maintain records of corrective actions taken on-site and document health findings into a project-dedicated logbook
5. Additionally, the CSO is responsible for logging all site visitors, checking for current medical and fit test certifications and applicable federal/state/local asbestos training for all those entering containment. The CSO does not provide specialized training for specific cleaning, abatement or interior component removal portions of the work. This shall be provided by each Subcontractor for its personnel.
• 6. The CSO shall document each orientation performed and requires that each person receiving the orientation complete, sign and date the HASP acknowledgement.
7. The CSO shall review the following documentation from each Subcontractor to complete the administrative record for the site: name of Subcontractor's safety officer; list of emergency contact phone numbers; confirmation of current worker fit tests, medical clearances and asbestos training for each Subcontractor employee; and Subcontractor HASP, including Hazard Communication Program, Fall Protection Program, Respiratory Protection Program, personal air monitoring program, and confined space program (when necessary).
2.1.3 Owner's Environmental Consultant
The Owner's Environmental Consultant shall provide a Certified Industrial Hygienist (CIH) and field industrial hygiene personnel during the project field work. The CIH shall manage developing and modifying this HASP, directing field industrial hygiene personnel responsible for the execution and monitoring of any health and safety activities at the site, review of monitoring data generated during the site work, walk-through safety and health spot field inspections, and advising the Owner and Contractor of unacceptable conditions are identified that may affect safety and health for personnel or the environment. •
The Copper Group —133-135 Greenwidt Street & 21-23 Thames Street Airtek Project 05=0710 - Phase I HASP 6-8-os Page 9 of 40
NYC-WTC 000127746
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
9 shared non-person entities · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
35 shared non-person entities · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
23 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
11 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
23 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
41 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
13 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
11 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
22 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
17 shared non-person entities · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗22 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000148621
Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.
Cited alongside this record in an Ask answer