NYC 9/11 Public Portal Document
Regulatory Submittal Part III — Health & Safety Plan
Fiterman Hall — 30 West Broadway, New York, New York
Airtek Project 05-0867 — January 10, 2006
2.0 SAFETY MANAGEMENT
The following safety management structure will be utilized for the implementation,
administration, and
monitoring of the HASP.
2.1 CONTRACTOR SAFETY OFFICER (CSO)
The Contractor shall have a CSO licensed as a New York City Site Safety Manager
(NYCSSM) on-
site throughout the project. The CSO shall assume on-site responsibility for the HASP.
The CSO or
designee shall monitor and maintain quality assurance of the HASP until project
completion.
Principal duties of the CSO include:
• Review project background data,
• Administer and enforce the HASP,
• Evaluate the adequacy of PPE to be used by Site personnel,
• Conduct required on-site training except tailgate safety meetings that will be
conducted by the Field Team Leader,
• Brief visitors on work Site conditions,
• Administer personnel air monitoring procedures.
• Notify the Environmental Consultant's CIH of any need to change or amend any
aspect of the approved Site HASP.
• Coordinate the health and safety activities of all the Contractor and Subcontractor
personnel to ensure the requirements of the HASP are followed.
• Communicate with all parties when changes occur on-site or when conditions
impacting the site occur concerning the response actions to be taken.
The CSO or designee has the authority to stop work in the event conditions develop
that pose an
unreasonable risk to Site personnel or persons in the vicinity. Additionally, the CSO shall
ensure
that Subcontractors perform the following operations under the direct on-site
supervision of OSHA
Competent Persons (provided by the Subcontractors for each task as necessary):
• General Construction (29 CFR 1926.20)
• Unsanitary Conditions (29 CFR 1926.27)
• Rigging (29 CFR 1926.251)
• Scaffolding (29 CFR 1926.450)
• Ladders (29 CFR 1926.1053)
• Personal Fall Arrest Systems (29 CFR 1926.500 and .502)
• Ear Protection (29 CFR 1926.101)
• Cranes and Derricks (29 CFR 1926.550)
• Materials Hoists, Personnel Hoists and Elevators (29 CFR 1926.552)
• Demolition (29 CFR 1926.850)
• Welding/Cutting on surfaces covered by protective coatings (29 CFR 1926.354)
• Excavation (29 CFR 1926.650)
• Lead (29CFR 1926.62)
• Asbestos (29 CFR 1926.1101)
• Cadmium 1926.1127
• Powered Platforms for Building Maintenance, 29 CFR 1910.66
• Hazardous Waste Operations and Emergency Response, 29 CFR 1926.65
NYC-WTC 000096631