Part III — Health & Safety Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701— Rev 1, August 11, 2005
3. The CSO shall act as the primary contact during any on-site emergency situation.
4. The CSO shall conduct accident investigations and prepare accident reports, prepare and
maintain records of corrective actions taken on-site and document health findings into a
project-dedicated logbook
5. Additionally, the CSO is responsible for logging all site visitors, checking for current
medical and fit test certifications and applicable federal/state/local asbestos training for
all those entering containment. The CSO does not provide specialized training for
specific cleaning, abatement or interior component removal portions of the work. This
shall be provided by each Subcontractor for its personnel.
6. The CSO shall document each orientation performed and requires that each person
receiving the orientation complete, sign and date the HASP acknowledgement.
7. The CSO shall review the following documentation from each Subcontractor to complete
the administrative record for the site: name of Subcontractor's safety officer; list of
emergency contact phone numbers; confirmation of current worker fit tests, medical
clearances and asbestos training for each Subcontractor employee; and Subcontractor
HASP, including Hazard Communication Program, Fall Protection Program, Respiratory
Protection Program, personal air monitoring program, and confined space program (when
necessary).
2.1.3 Owner's Environmental Consultant
The Owner's Environmental Consultant shall provide a Certified Industrial Hygienist (CIH) and
field industrial hygiene personnel during the project fieldwork. The CIH shall manage
developing and modifying this HASP, directing field industrial hygiene personnel responsible for
the execution and monitoring of any health and safety activities at the site, review of monitoring
data generated during the site work, walk-through safety and health spot field inspections, and
advising the Owner and Contractor of unacceptable conditions identified that may affect safety
and health for personnel or the environment. The responsibilities of the Owner's Environmental
Consultant shall include monitoring for visible emissions as detailed in the Environmental
Monitoring Specification.
2.1.4 Subcontractors
Each Subcontractor on the job is responsible for:
1. Preparing a Subcontractor HASP specific for their scope of work (SOW).
2. Having a supervisor on-site who understands the scope of the work to be performed,
potential health and safety issues associated with that SOW and the strategies for
managing and controlling the health and safety issues.