EPA work plan review, 133-135 and 21-23 buildings, August 2005

Machine-extracted title · confidence 75%

EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.

NYC-WTC_000134871–000135144
Page image
Scanned page image, NYC-WTC_000134985
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part 111 —Health & Safety Plan 133-135 Greenwich Streetl21-23 Thames Street Airtek Project 05-0701 — Rev 1, August It, 2005

1. The Contractor Project Manager shall have overall responsibility for ensuring health and safety protection on the site and for ensuring that all elements of the HASP are implemented during all phases of the daily on-site activities of this project.

2. The Contractor Project Manager shall oversee the Contractor's responsibility to monitor for visible emissions.

3. The Contractor shall notify the Environmental Consultant's CIH of any need to change or amend any aspect of this HASP and/or seek input with regard to interpretations of the HASP in concert with the designated Safety Officers of the Subcontractors.

4. The Contractor shall consult with and coordinate any modifications to the HASP with the Environmental Consultant's CIH; will recommend corrective actions for identified deficiencies; and will oversee the implementation of any corrective actions.

5. The Contractor shall coordinate the health and safety activities of all the Contractor and Subcontractor personnel to ensure the requirements of the HASP are followed and shall communicate with all parties when changes occur on-site or when conditions impacting the site occur concerning the response actions to be taken.

6. The Contractor shall direct the implementation and enforcement of this HASP and consult with the Subcontractors regarding the health and safety procedures and practices to be used on this project.

7. The Contractor shall enforce the requirements of this HASP with respect to health and safety, air monitoring requirements and waste management requirements.

8. The Contractor shall perform on-site training and the day-to-day on-site implementation and enforcement of the HASP.

9. The Contractor shall ensure site compliance with federal/state/local regulations and all aspects of this HASP including, but not limited to; Performing activity hazard analyses, Providing guidance concerning the use of PPE, Ensuring site control, Developing standard operating procedures to minimize hazards such as the use of engineering controls. GMT (0, ?k o tltO 6 ? P- F 0 JM

2.1.2 Contractor's Site Safety Officer (CSO) ,~ .

1. The Contractor shall have a Site Safety Manager (CSO) on-site during the project on a full time basis for the entire duration of on-site field activities. If operations are performed during more than one work shift per day, a qualified Contractor Site Manager shall be present for each shift.

2. The CSO shall have authority to stop any and all work activities if unacceptable health and safety conditions exist or if actions occur that may affect safety and health conditions for personnel or the environment. The authority to stop work shall include an automatic work stoppage if visible emissions leave the Site perimeter.

8

NYC-WTC 000134985

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134985Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →