Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

NYC-WTC_000127738–000127777

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127745
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• 17. Comply with the HASP and all health and safety recommendations and precautions.

18. Notify their supervisor of any Site conditions or concerns which are not addressed by the protective measures specified in this HASP, or which are addressed but the employee does not understand the protective requirements specified herein.

2.1.1 Contractor

1. The Contractor Project Manager shall have overall responsibility for ensuring health and safety protection on the site and for ensuring that all elements of the HASP are implemented during all phases of the daily on-site activities of this project.

2. The Contractor shall notify the Environmental Consultant's CIH of any need to change or amend any aspect of this HASP and/or seek input with regard to interpretations of the HASP in concert with the designated Safety Officers of the Subcontractors.

3. The Contractor shall consult with and coordinate any modifications to the HASP with the Environmental Consultant's CIH; will recommend corrective actions for identified deficiencies; and will oversee the implementation of any corrective actions.

• 4. The Contractor shall coordinate the health and safety activities of all the Contractor and Subcontractor personnel to ensure the requirements of the HASP are followed and shall communicate with all parties when changes occur on-site or when conditions impacting the site occur concerning the response actions to be taken.

5. The Contractor shall direct the implementation and enforcement of this HASP and consult with the Subcontractors regarding the health and safety procedures and practices to be used on this project.

6. The Contractor shall enforce the requirements of this HASP with respect to health and safety, air monitoring requirements and waste management requirements.

7. The Contractor shall perform on-site training and the day-to-day on-site implementation and enforcement of the HASP.

8. The Contractor shall ensure site compliance with federal/state/local regulations and all aspects of this HASP including, but not limited to; Performing activity hazard analyses, Providing guidance concerning the use of PPE, Ensuring site control, Developing standard operating procedures to minimize hazards such as the use of engineering controls

. 2.1.2 Contractor's Site Safety Officer (CSO)

The Copper Group —133-135 Greenwich Street & 21-23 Thames Street Air Project 05=0710 - Phase I HASP 6-8-05 Page 8 of 40

NYC-WTC 000127745

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127745Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →