NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/BINDER - PHASE 1 DECONTAMINATION PLAN
Document / 40 pages

Health and Safety Plan, June 2005

Machine-extracted title · confidence 100%

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

NYC-WTC_000127738–000127777

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127768
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• On-site "Chain of Command" • Designated on-site emergency meeting location • Recognition of evacuation signals and alarms

2.10.2 Visitor Training

Site visitors are defined as persons who are not employed at the project site, who do not routinely enter restricted work areas, or whose presence is of short duration (i.e., one to two days per month).

During Phase I all visitors entering the EZ must provide proof of an up-to-date fit-testing and medical clearance, an completion of asbestos certifications required for the employee's scope of work. In addition each visitor will receive site-specific training by the Contractor SSM or HASP AM that includes:

Location and description of potential hazards and risks Required PPE Areas of the site that may be closed to visitors The site evacuation plan and emergency procedures Other Topics as deemed appropriate by the Contractor SSM

2.10.3 Because of lead and cadmium being identified as COECs and the potential for lead fumes . or dust to be produced in deconstruction from building materials, subcontractors will provide proof of training required in OSHA Specific Standards 29 CFR 1926.65 (Lead in Construction) and 1926.1127 (Cadmium).

2.11 HAZARD COMMUNICATION

The Contractor and Subcontractors shall notify the Contractor SSM of any hazardous products prior to bringing the chemical on site and shall provide a MSDS for each product. These MSDSs shall be maintained by the Contractor SSM and shall be kept in a site master file. In addition, each Subcontractor shall maintain a copy of the MSDS for each product that they bring on-site.

The Subcontractor shall review with the Contractor SSM the procedures for handling, using and storing the chemicals brought on-site, and shall review with their personnel the proper procedures for handling, using and storing the chemicals before the product is used on-site. This includes but is not limited to all commercial products brought on-site by Subcontractors, including commercial cleansers, degreasers, lubricants and paints. 2.11.1 Container Labels

All containers of hazardous materials shall be labeled in accordance with appropriate standards. The labels on containers provided by the manufacturer, importer, or distributor • shall be used.

The Copper Group —133-135 Greenwkh Street & 21-23 Thames Sheet arbek Project 05-0710 - Phase I HASP 6-8-05 Page 31 of 40

NYC-WTC 000127768

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127768Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →