Health and Safety Plan, June 2005

Machine-extracted title · confidence 100%

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

NYC-WTC_000127738–000127777

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127767
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• • Proper PPE to be used during work activities. • Location of the MSDS files. • How to reduce or prevent exposure to hazardous chemicals through the use of procedures, work practices, and personal protective equipment.

2.9.2 Asbestos Training

ACBM was determined to be in several building components per the Airtek Building Asbestos Survey. Building Personnel entering containment shall be trained to identify ACBM and the hazards associated with asbestos in accordance with the OSHA Asbestos Standards (29 CFR 1910.1001 and 29 CFR 1926.1101) and state/local certification requirements. This training provides personnel with a better understanding of asbestos and the steps to be taken to protect themselves and the public. In areas that ACBM was identified, required NYSDOL and NYCDEP procedures shall be followed.

2.9.3 HAZWOPER Training

Personnel entering the exclusion or contamination zones for the purpose of performing cleanup abatement activities must have received the required 40 hour training as outlined by 29 CFR 1910.120(a) (i) and appropriate annual refresher training as required. This HAZWOPER training requirement may be removed, should sampling indicate training requirement downgrade is appropriate.

• 2.10 PERSONAL PROTECTIVE EQUIPMENT TRAINING

Each Subcontractor shall provide training concerning the use of PPE to their personnel, as specified by this plan, to address the general PPE requirements and any specific requirements for PPE they may use, such as fall protection. The Contractor SSM or HASP AM can assist with this training, and any concerns regarding the use of appropriate PPE shall be brought to the attention of the Contractor SSM. Further discussion of the types of PPE is presented in Subsection 2.5 of this HASP

2.10.1 Emergency Response Training

Emergency response training, in accordance with the Emergency Action Plan found within Section 3 of the Phase I Deconstruction Plan, shall be provided to all on-site- personnel as part of the site-specific safety and health awareness training. The emergency response training shall be conducted by each Subcontractor's Safety Officer for /her respective employees. At a minimum, the topics of this training shall include the following:

• Location of all site emergency equipment • Response procedures for fires • Response procedures for injuries and accidents • • On-site/off-site response resources • Emergency site operations shut down procedures

The Copper Group —133-135 Gree,w ch Street & 21-23 Thames Street Airtek Project 05=0710 - Phase I HASP 6-8-05 Page 30 of 40

NYC-WTC 000127767

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127767Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →