Health and Safety Plan, June 2005

Machine-extracted title · confidence 100%

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

NYC-WTC_000127738–000127777

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127747
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• 2.1.4 Subcontractors

1. Each Subcontractor on the job is responsible for:

2. Preparing a Subcontractor HASP specific for their scope of work (SOW)

3. Having a supervisor on-site who understands the scope of the work to be performed, potential health and safety issues associated with that SOW and the strategies for managing and controlling the health and safety issues.

4. Planning all work activities to prevent personal injury, health impairment and property damage.

5. Providing a Subcontractor Safety Officer and Alternate Safety Officer who shall remain on-site for the entire duration of the Subcontractor's SOW and ensure employee compliance with the provisions of this HASP and the Subcontractor HASP.

6. Ensuring that Subcontractor personnel are qualified to perform the SOW that they are assigned.

7. Communicating with the Contractor personnel and other potential affected Subcontractors when work on-site conditions are identified that can impact health • and safety on the job.

8. Ensuring training (asbestos, HAZWOPER, Hazard Communication, etc.) of the Subcontractor's employees in the recognition, avoidance and control of chemical, biological and physical hazards present at the Site.

9. Maintaining records for Subcontractor employees as required by this HASP (including but not limited to) medical, training and fit-test records.

10. Providing daily health and safety briefings to their personnel.

11. Providing specified PPE, including training for correct use and maintenance of that equipment.

12. Providing adequate weather protective gear for their personnel as required for their work activities.

13. Maintaining a system of prompt detection and correction of unsafe practices and conditions for their SOW and employees.

14. Ensuring that Subcontractor's subcontractors and suppliers comply with the conditions of this HASP upon entrance to the Site.

• 15. Collecting personal air samples for both asbestos and other COPCs for HASP and OSHA compliance. Each Subcontractor's CIH or qualified Industrial Hygienist

The Copper Group —133-135 Greenwich Street & 21-23 Thames Street Airtek Project O5-o710 - Phase I HASP 6-8-05 Page 10 of 40

NYC-WTC 000127747

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127747Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →