Part III — Health & Safety Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 — Rev 1, August 11, 2005
9 Exterior Wash Down Level C *** Working from Fall Protection Fall Protection
Elevations
Heat Stress Heat monitoring
Cold Stress Cold monitoring
Slip/trip/fall Housekeeping
Lifting Proper liftin techniques
Electrical Electrical Safety LOTO Lock-out Tag-out
Sources Program
Pinch points Materials handling
Hand tools Proper use techniques
Inadequate Illumination
lighting
10 Removal of Miscellaneous Level C*** Chemical Hazard Hazardous Materials
Hazardous Materials (bulbs, COPC Communication/PPE Communication
ballasts, batteries, mercury- Structural Structural integrity Program and 29 CFR
containing thermostats, etc) damage 1910.120(aXi)
Trespassers Site security
Pinch points Materials handling
Hand tools Proper use techniques
Heat stress Heat monitoring
Cold stress Cold monitorin
Asbestos Avoidance/monitoring/PPE
*As described in Section 2.5
** Procedures are part of Contractors Project Safety Plan
***Per 2.72
+Due to enclosure and unknown airborne silica concentrations work will have to be performed using PAPR with P100 cartridges
and local exhaust ventilation or work will be performed under
Level B until air sampling allows otherwise.
If site conditions change during the course of the deconstruction project, the Environmental
Consultant will evaluate the new conditions and discuss appropriate amendments to the HASP
with the Contractor. The proposed amendments shall be reviewed and approved by the
Environmental Consultant's CIH and the Contractor Project Manager.
2.2.3 Physical Hazards
While the buildings at 133-135 Greenwich/21-23 Thames Street suffered no significant damage
from the WTC Collapse, numerous physically hazardous conditions exist related to the
deteriorated, run-down condition of much of the space in these buildings. These hazards include
damaged electrical sources and components, falling hazards due to openings in the floors, or the
possibility of materials falling from overhead. The primary physical hazards that may be
encountered during this project are related to the Abatement Phase activities and include: heavy
equipment operation; excessive noise; excessive heat or cold; inclement weather; manual
lifting/handling of heavy objects; poor housekeeping; rough terrain; compromised structural
integrity; traffic; cranes, hoists and other lifting equipment;, aerial lifts and manlifts! working at
elevation; use of scaffolding; hazardous materials use; potential utility and electrical sources; use
of hand and power tools; slips and falls; etc.
Due to the existence of these hazards, the Contractor shall ensure that all site employees receive
hazard awareness training. Additionally, the Contractor shall insure that Subcontractors perform
the following operations under the direct on-site supervision of OSHA Competent Persons
(provided by the Subcontractors for each task as necessary):