EPA work plan review, 133-135 and 21-23 buildings, August 2005

Machine-extracted title · confidence 75%

EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.

NYC-WTC_000134871–000135144
Page image
Scanned page image, NYC-WTC_000135001
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part III — Health & Safety Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 — Rev 1, August 11, 2005

9 Exterior Wash Down Level C *** Working from Fall Protection Fall Protection Elevations Heat Stress Heat monitoring Cold Stress Cold monitoring Slip/trip/fall Housekeeping Lifting Proper liftin techniques Electrical Electrical Safety LOTO Lock-out Tag-out Sources Program Pinch points Materials handling Hand tools Proper use techniques Inadequate Illumination lighting 10 Removal of Miscellaneous Level C*** Chemical Hazard Hazardous Materials Hazardous Materials (bulbs, COPC Communication/PPE Communication ballasts, batteries, mercury- Structural Structural integrity Program and 29 CFR containing thermostats, etc) damage 1910.120(aXi) Trespassers Site security Pinch points Materials handling Hand tools Proper use techniques Heat stress Heat monitoring Cold stress Cold monitorin Asbestos Avoidance/monitoring/PPE

*As described in Section 2.5 ** Procedures are part of Contractors Project Safety Plan ***Per 2.72 +Due to enclosure and unknown airborne silica concentrations work will have to be performed using PAPR with P100 cartridges and local exhaust ventilation or work will be performed under Level B until air sampling allows otherwise.

If site conditions change during the course of the deconstruction project, the Environmental Consultant will evaluate the new conditions and discuss appropriate amendments to the HASP with the Contractor. The proposed amendments shall be reviewed and approved by the Environmental Consultant's CIH and the Contractor Project Manager.

2.2.3 Physical Hazards

While the buildings at 133-135 Greenwich/21-23 Thames Street suffered no significant damage from the WTC Collapse, numerous physically hazardous conditions exist related to the deteriorated, run-down condition of much of the space in these buildings. These hazards include damaged electrical sources and components, falling hazards due to openings in the floors, or the possibility of materials falling from overhead. The primary physical hazards that may be encountered during this project are related to the Abatement Phase activities and include: heavy equipment operation; excessive noise; excessive heat or cold; inclement weather; manual lifting/handling of heavy objects; poor housekeeping; rough terrain; compromised structural integrity; traffic; cranes, hoists and other lifting equipment;, aerial lifts and manlifts! working at elevation; use of scaffolding; hazardous materials use; potential utility and electrical sources; use of hand and power tools; slips and falls; etc.

Due to the existence of these hazards, the Contractor shall ensure that all site employees receive hazard awareness training. Additionally, the Contractor shall insure that Subcontractors perform the following operations under the direct on-site supervision of OSHA Competent Persons (provided by the Subcontractors for each task as necessary):

UP

NYC-WTC 000135001

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000135001Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →