Part III — Health & Safety Plan
133-135 Greenwich Street/21-23 Thames Street
7 ~K G 'I
Airtek Project 05-0701— ev 3, August 29, 2005 t-
o Fume educto attached to HEPA filters for all hand-powered tools.
• Rem lead-based painted materials (if necessary), and adequate exhaust
ventilation provided.
Barricades, railings or other devices to prevent employee exposure to fall hazards or
moving equipment per 29 CFR 1926.
Other task-specific engineering controls as recommended by OSHA guidelines or as
recommended by the Contractor or the CIH.
2.4 ADMINISTRATIVE CONTROLS AND WORK PRACTICES
Each Subcontractor shall utilize administrative controls and work practices as a secondary means
of ensuring worker health and safety when engineering controls do not provide sufficient
protection or are technically infeasible. Each Subcontractor shall be responsible for the provision
and/or implementation of the following:
Ensuring all employees are enrolled in a medical monitoring program as required by
OSHA, including medical monitoring for blood lead levels as outlined in Section 2.13 of this
HASP.
Ensuring all employees have current fit-test and training certifications.
Implementing work practices that avoid generating dust whenever possible.
Requiring that all employees implement decontamination procedures, including washing hands,
face, hair and neck upon leaving the work area and before eating, drinking or smoking.
Removing lead based paint or coatings before cutting, grinding or other activities that would be
expected to disturb the lead-based materials, or complying with the provisions of 29 CFR
1926.62.
Use of the Buddy System will be required for all employees working within the
Exclusion Zone, as defined in Section 2.8.1 below, or while performing non-standard tasks as
designated by the Subcontractor's Safety Officer.
2.5 PERSONAL PROTECTIVE EQUIPMENT (PPE) Ce } ~ ~\ oj'k ec c
J
Personal protective equipment will be used to provide ade to personnel protection only after
feasible engineering and strative contro optio have been exhausted. All personnel
engaged in the project work activities wi use a appropriate level of protection as require by
activity to be performed and are presented in the "Task Hazard Analysis" presented in able
2-1.