NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 02/30 West Broadway
Document / 53 pages

Permit application Part III, health Jan 2006

Machine-extracted title · confidence 90%

Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.

NYC-WTC_000095781–000095833

Folder label: “30 West Broadway”

Page image
Scanned page image, NYC-WTC_000095813
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Regulatory Submittal Part III — Health & Safety Plan Fiterman Hall— 30 West Broadway, New York, New York Airtek Project 05-0867-. January 10.2006

8A ENGINEERING AND ADMINISTRATIVE CONTROLS

ERI~~~L -leIi;i~~li1_►rCs~~Z~)~~I}:~i3_ifl.~

Each Subcontractor shall be responsible for providing and implementing Engineering Controls as a primary means of ensuring worker health and safety, and shall provide the following minimum controls:

• HEPA-filtered air filtration equipment to reduce area dust levels; • HEPA-filtered Vacuum cleaners; • Fume eductors with HEPA filters for all hand-powered tools; • Torching or cutting activities involving lead-based painted materials shall use adequate mechanical or natural exhaust ventilation; • Barricades, railings or other devices to prevent employee exposure to fall hazards or moving equipment (29 CFR 1926); and • Other task-specific engineering controls as recommended by OSHA guidelines or as recommended by the Contractor CSO or CIH.

8.2 ADMINISTRATIVE CONTROLS

Each Subcontractor shall be responsible for the provision and/or implementation of the following administrative controls as a secondary means of ensuring worker health and safety:

• Ensure all employees are enrolled in a medical monitoring program as required by OSHA; • Ensure all employees have current fit-test and training certifications; • Implement work practices that avoid generating dust whenever possible; • Require all employees implement decontamination procedures, including washing hands, face, hair and neck upon leaving the work area and before eating, drinking or smoking; • Remove lead based paint or coatings before cutting, grinding or other activities that would be expected to disturb the lead-based materials, or complying with the provisions of 29 CFR 1926.62; and • Require that the Buddy System be utilized required when employees are working within the EZ while performing non-standard tasks as identified by the Subcontractor's Safety Officer.

8.3 WORK ZONES

• Support Zone

This area includes the ground outside of the building and any temporary structures/office spaces. The Support Zone starts at the project/property fence line and extends to the entry to where personnel enter the building to complete the work tasks. All personnel shall wear Level D PPE while in the Support Zone. NOTE: Within this area EZs may be established that require restricted access and/or additional PPE depending on the operations, for example: where material handling is performed, where hoisting equipment is Iocated or where equipment is staged.

• Decontamination Unit/Contamination Reduction Zone (CRZ)

33

NYC-WTC 000095813

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000095813Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →