NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 02/201 WARREN STREET Block: 16 Lot: 220
Document / 53 pages

Health and safety plan Part II, 30 Warren Street, January

Machine-extracted title · confidence 100%

Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.

NYC-WTC_000096623–000096675

Folder label: “201 WARREN STREET Block: 16 Lot: 220

Page image
Scanned page image, NYC-WTC_000096655
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Regulatory Submittal Part III — Health & Safety Plan Fiterman Hall — 30 West Broadway, New York, New York Airtek Project 05-0867 — January l0, 2006

8.0 ENGINEERING AND ADMINISTRATIVE CONTROLS

8.1 ENGINEERING CONTROLS

Each Subcontractor shall be responsible for providing and implementing Engineering Controls as a primary means of ensuring worker health and safety, and shall provide the following minimum controls:

• HEPA-filtered air filtration equipment to reduce area dust levels; • HEPA-filtered Vacuum cleaners; • Fume eductors with HEPA filters for all hand-powered tools; • Torching or cutting activities involving lead-based painted materials shall use adequate mechanical or natural exhaust ventilation; • Barricades, railings or other devices to prevent employee exposure to fall hazards or moving equipment (29 CFR 1926); and • Other task-specific engineering controls as recommended by OSHA guidelines or as recommended by the Contractor CSO or CIH.

8.2 ADMINISTRATIVE CONTROLS

Each Subcontractor shall be responsible for the provision and/or implementation of the following administrative controls as a secondary means of ensuring worker health and safety:

• Ensure all employees are enrolled in a medical monitoring program as required by OSHA; • Ensure all employees have current fit-test and training certifications; • Implement work practices that avoid generating dust whenever possible; • Require all employees implement decontamination procedures, including washing hands, face, hair and neck upon leaving the work area and before eating, drinking or smoking; • Remove lead based paint or coatings before cutting, grinding or other activities that would be expected to disturb the lead-based materials, or complying with the provisions of 29 CFR 1926.62; and • Require that the Buddy System be utilized required when employees are working within the EZ while performing non-standard tasks as identified by the Subcontractor's Safety Officer.

8.3 WORK ZONES

• Support Zone

This area includes the ground outside of the building and any temporary structures/office spaces. The Support Zone starts at the project/property fence line and extends to the entry to where personnel enter the building to complete the work tasks. All personnel shall wear Level D PPE while in the Support Zone. NOTI✓t Within this area EZs may be established that require restricted access and/or additional PPE depending on the operations, for example: where material handling is performed, where hoisting equipment is located or where equipment is staged.

• Decontamination Unit/Contamination Reduction Zone (CRZ)

33

NYC-WTC 000096655

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000096655Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Cited alongside this record in an Ask answer

Compare copies and versions →