NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
9 shared non-person entities · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
NYC-WTC_000127738–000127777Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
• shall be responsible for evaluating the condition and implementing steps to eliminate rodents on the site.
The initial building walk-though by Airtek environmental identified mold contaminated building materials/components within the Building. The identification of additional mold/fungi on-site will be made based on visual inspections of building materials. When mold/fungi are identified, the removal of impacted materials shall be addressed concurrently with Asbestos Abatement Activities. Removal and handling measures shall be consistent with the NYC Department of Health and Mental Hygiene "Guidelines on Assessment and Remediation of Fungi in Indoor Environments."
2.3 ENGINEERING CONTROLS
Engineering controls will be used as primary protective mechanisms to protect the safety and health of all employees whenever technically feasible, and prior to the implementation of Administrative Controls and/or personal protective equipment. Each Subcontractor shall be responsible for the provision and implementation of the following:
HEPA-filtered air filtration devices to reduce area dust levels.
Vacuum cleaners equipped with HEPA filters.
Fume eductors attached to HEPA filters for all hand-powered tools.
• Removal of all lead-based painted materials (if necessary), and adequate exhaust ventilation provided during torching or cutting activities.
Barricades, railings or other devices to prevent employee exposure to fall hazards or moving equipment per 29 CFR 1926.
Other task-specific engineering controls as recommended by OSHA guidelines or as recommended by the Contractor or the CIH.
2.4 ADMINISTRATIVE CONTROLS AND WORK PRACTICES
Each Subcontractor shall utilize administrative controls and work practices as a secondary means of ensuring worker health and safety when engineering controls do not provide sufficient protection or are technically infeasible. Each Subcontractor shall be responsible for the provision and/or implementation of the following:
Ensuring all employees are enrolled in a medical monitoring program as required by OSHA, including medical monitoring for blood lead levels as outlined in Section 2.13 of this HASP.
Ensuring all employees have current fit-test and training certifications.
• Implementing work practices that avoid generating dust whenever possible.
The Copper Group —133-135 Greenwich Street & 21-23 Thames Street Airtek Project 05=0710 - Phase I HASP 6-8-OS Page 20 of 40
NYC-WTC 000127757
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
9 shared non-person entities · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
35 shared non-person entities · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
23 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
11 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
23 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
41 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
13 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
11 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
22 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
17 shared non-person entities · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗22 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000148621
Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.
Cited alongside this record in an Ask answer