NYC 9/11 Public Portal Document
Part III — Health & Safety Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701— Rev 3, August 29, 2005
2.2.4 Chemical Hazards
A chemical hazard that may be encountered during this project is asbestos. Based upon the most
recent pre-demolition asbestos survey conducted by Airtek environmental Corp., approximately
50 linear feet of friable, and 400 square feet of non-friable asbestos-containing material has been
identified. In addition, WTC dust with assumed varying concentrations of COPCs, has been
identified during visual inspection of the site. Therefore, the Contractor shall ensure that all site
employees receive the required training concerning asbestos as well as all applicable Hazard
Communication training.
In addition, personnel who have the potential to disturb ACBM shall be trained concerning the
procedures to be used and requirements for notifications in accordance with federal, state and
local regulations. Personnel who handle ACBM on this job shall have the required documented
training and certificates. Each employee involved in abatement activities must have completed
City of New York asbestos training, shall be a certified asbestos worker and/or supervisor by the
City of New York, and shall be certified asbestos handler and/or supervisor by the New York
State Department of Labor. Additionally, personnel who will conduct cleaning and abatement
activities must have additionally received the required 40-hour training as outlined by 29 CFR
1910.120(a) (i) (HAZWOPER requirement) and appropriate annual refresher training as
required. This HAZWOPER training requirement may be removed, should sampling indicate
training requirement downgrade is appropriate. Training, medical and license documentation for
each Subcontractor employee shall be verified by the CSO prior to start of work by the
Subcontractor.
2.2.4.1 Additional Identified Chemicals
Other chemicals identified as potential contaminants that may be encountered during the initial
site cleaning activities are PAHs, dioxins, antimony, cadmium, nickel, barium, chromium, lead,
zinc, manganese, copper, beryllium, PCBs, mercury, copper, zinc, cristobalite and quartz.
Environmental sampling in the neighboring buildings has verified the presence of these chemical
contaminants in WTC dust in concentrations exceeding USEPA's Residential Cleanup Criteria.
Additional chemical hazards generated from deconstruction activities would be lead, cadmium,
and chromium from coated surfaces. Subcontractors shall perform personnel monitoring for all
COPCs as required by OSHA. In addition, Subcontractors must provide applicable OSHA
training for the identified hazards. Documentation of this training must be provided by the
Subcontractor.
Precautions to be taken during the removal of miscellaneous hazardous materials (bulbs, ballasts,
batteries, mercury-containing thermostats, etc) are found in Table 2-1, Task 3. Respiratory
protection, as identified within Table 2-1, represents the minimum level of protection for all
identified tasks.
There may also be hazardous chemicals brought on-site and used in the deconstruction. The
requirements of the OSHA Hazard Coxmunications Standard (29 CFR 1910.1200) shall apply.
(~ fcc N4d tfkq IL L. r r~`I~I~CQ 19
NYC-WTC 000134286