NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 55/No folder label
Document / 283 pages

EPA review letter, 133-135 Greenwich Street

Machine-extracted title · confidence 90%

US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.

NYC-WTC_000134132–000134414
Page image
Scanned page image, NYC-WTC_000134285
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part III — Health & Safety Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701— Rev 3, August 29, 2005

If site conditions change during the course of the deconstruction project, the Environmental Consultant will evaluate the new conditions and discuss appropriate amendments to the HASP with the Contractor. The proposed amendments shall be reviewed and approved by the Environmental Consultant's CIH and the Contractor Project Manager.

2.2.3 Physical Hazards

While the buildings at 133-135 Greenwich/21-23 Thames Street suffered no significant damage from the WTC Collapse, numerous physically hazardous conditions exist related to the deteriorated, run-down condition of much of the space in these buildings. These hazards include damaged electrical sources and components, falling hazards due to openings in the floors, or the possibility of materials falling from overhead. The primary physical hazards that may be encountered during this project are related to the Abatement Phase activities and include: heavy equipment operation; excessive noise; excessive heat or cold; inclement weather; manual lifting/handling of he objects; poor housekeeping; ough terrain, compromised structural inte it /• >c• cranes, hoists and other lifting equipment;, aerial h and manlifts; rkiig t el ation• use of sca o gJiazardous materials handling; potential utility and electrical sources; use of hand and power tools; slips and falls; etc.

Due to the existence of these hazards, the Contractor shall ensure that all site employees receive hazard awareness training. Additionally, the Contractor shall insure that Subcontractors perform the following operations under the direct on-site supervision of OSHA Competent Persons (provided by the Subcontractors for each task as necessary):

• General Construction (29 CFR 1926.20) • Unsanitary Conditions (29 CFR 1926.27) • Rigging (29 CFR 1926.251) • Scaffolding (29 CFR 1926.450) • Ladders (29 CFR 1926.1053) • Personal Fall Arrest Systems (29 CFR 1926.500 and .502) • Ear Protection (29 CFR 1926.101) • Cranes and Derricks (29 CFR 1926.550) • Materials Hoists, Personnel Hoists and Elevators (29 CFR 1926.552) • Demolition (29 CFR 1926.850) • Welding/Cutting on surfaces covered by protective coatings (29 CFR 1926.354) • Excavation (29 CFR 1926.650) Lead (29CFR 1926.62) • Asbestos (29 CFR 1926.1101) • Cadmium 1926.1127 • Powered Platforms for Building Maintenance, 29 CFR 1910.66 • Hazardous Waste Operations and Emergency Response, 29 CFR 1926.65

LI

NYC-WTC 000134285

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134285Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →