Part III — Health & Safety Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-070 1 — Rev 1, August 11, 2005
This document incorporates relevant health and safety guidance developed for the Lower
Manhattan Development Corporation's 130 Liberty Street building Phase I Deconstruct Project
as described in their May 2005 Health and Safety Plan for that project.
Compliance with this HASP is required due to hazards associated with the Buildings' current
condition and anticipated Abatement Phase activities. This HASP is based upon current
knowledge of conditions at the Site and will be updated as new information becomes available
and/or conditions change within the Building.
2.0 HEALTH AND SAFETY PROCEDURES
This section identifies the principal hazards associated with the tasks to be performed during the
cleaning, asbestos and COPC abatement, and interior component removal activities, and
establishes standard safety and health procedures for the Contractor, the Subcontractors and
anyone who comes onto the site. The content of this HASP is designed to anticipate, identify,
evaluate, and control safety and health hazards for the work activities to be performed during this
project. All on-site work activities by any Subcontractors and their designees shall be performed
in accordance with this HASP, and in accordance with applicable federal, state, and local
regulations.
The levels of personal protection and the procedures specified in this Plan are based on the best
information available from validated reference sources (i.e., OSHA, NIOSH) and current site
data. Therefore, the guidelines presented in this HASP represent the minimum health and safety
requirements to be observed by all on-site personnel engaged in this project. Discovery of
currently unknown site conditions or changes in the scope of work will necessitate the
reassessment of the protection levels, controls, and procedures stated herein. All amendments to
this HASP must have prior written approval by the Environmental Consultant's Certified
Industrial Hygienist (CIH) and the Contractor's Project Manager.
2.1 PERSONNEL RESPONSIBILITIES
The Contractor, Subcontractor and other personnel on-site shall review and understand this
document prior to working on-site.
All personnel shall:
1. Participate in initial site orientation/training as described in Section 2.9.1, and daily
safety meetings, and shall provide any required documentation, medical clearance, fit
test, asbestos certification, etc. prior to starting work on the site. Documentation
requirements are determined by activities to be performed.
2. Sign the HASP Acknowledgement Form and other required documents after orientation
to indicate that they participated in orientation and understood the information presented
in orientation.
N
NYC-WTC 000134983
OCR can misread numbers and units. Confirm readings against the page image before using them.