. presented to ensure compliance with all applicable government agencies and regulations,
including requirements and protocols established by: the Occupational Safety and Health
Administration (OSHA); the National Institute of Occupational Safety and Health
(NIOSH); the United States Environmental Protection Agency (USEPA); the New York
State Department of Conservation (NYSDEC); the State of New York, New York State
Department of Labor (NYSDOL); the New York City Department of Environmental
Protection (NYCDEP); and the City of New York.
This document incorporates relevant health and safety guidance developed for the Lower
Manhattan Development Corporation's 130 Liberty Street building Phase I Deconstruct
Project as described in their May 2005 Health and Safety Plan for that project.
Compliance with this HASP is required due to hazards associated with the Buildings'
current condition and anticipated Phase I activities. This HASP is based upon current
knowledge of conditions at the Site and will be updated as new information becomes
available and/or conditions change within the Building.
2.0 HEALTH AND SAFETY PROCEDURES
This section identifies the principal hazards associated with the tasks to be performed
during the cleaning, asbestos and COPC abatement, and interior component removal
activities, and establishes standard safety and health procedures for the Contractor, the
Subcontractors and anyone who comes onto the site. The content of this HASP is
• designed to anticipate, identify, evaluate, and control safety and health hazards for the
work activities to be performed during this project. All on-site work activities by any
Subcontractors and their designees shall be performed in accordance with this HASP, and
in accordance with applicable federal, state, and local regulations.
The levels of personal protection and the procedures specified in this Plan are based on
the best information available from validated reference sources (i.e., OSHA, NIOSH) and
current site data. Therefore, the guidelines presented in this HASP represent the
minimum health and safety requirements to be observed by all on-site personnel engaged
in this project. Discovery of currently unknown site conditions or changes in the scope of
work will necessitate the reassessment of the protection levels, controls, and procedures
stated herein. All amendments to this HASP must have prior written approval by the
Environmental Consultant's Certified Industrial Hygienist (CIH) and the Contractor's
Project Manager.
2.1 PERSONNEL RESPONSIBILITIES
The Contractor, Subcontractor and other personnel on-site shall review and understand
this document prior to working on-site.
All personnel shall:
L~
The Copper Group -133-135 Greenwich Street & 21-23 Thames Street
Airtek Project O5-0710 - Phase I HASP 6-8-05 Page 6 of 40
NYC-WTC 000127743