NYC 9/11 Public Portal Document
Part III — Health & Safety Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701— Rev 1, August 1 1, 2005
dust (asbestos, dioxin, lead, polycyclic aromatic hydrocarbons [PAHs], and crystalline silica) as
well as other contaminants suspected of being present in the Buildings including polychlorinated
biphenyls (PCBs) and heavy metals (antimony, barium, beryllium, cadmium, chromium, copper,
manganese, mercury, nickel and zinc).
The Owner has retained Airtek Environmental Corp. to conduct Environmental Investigations of
the buildings for additional unidentified asbestos containing building materials (ACBM). These
environmental reports are included as Attachment 2 to this HASP.
The requirements outlined within this Abatement Phase Health and Safety Plan are based upon
the data collected to date. As additional information is obtained during the course of the Phase I
activities, these requirements will be amended if necessary to protect workers or the public.
1.2 SITE DESCRIPTION
The Property is currently developed for a combination of commercial and multi-family
residential use. The Property includes a vacant two-story commercial building that was
constructed on the northwestern portion of the Property circa 1980. The building was most
recently occupied by a pizza shop, a coffee shop, a Japanese restaurant, an Indian restaurant, a
shoe repair shop, and second floor professional (doctors') offices. The Property also includes a
vacant five-story building that was constructed on the southeastern portion of the Property prior
to 1894. This building includes two ground floor tenant spaces most recently occupied by a
sandwich shop, a Western Union office, and approximately eight residential units.
The Property is located within the urban commercial downtown Financial District of Manhattan,
New York City, immediately south of the former World Trade Center site and adjacent to the
vacant Deutsche Bank Building. The Property is bound to the northwest by the Deutsche Bank
building (1-13 Albany Street; 122-146 Greenwich Street; 126-138 Liberty Street; 133-151
Washington Street; and 1 Bankers Trust Plaza), a vacant high-rise commercial building that was
heavily damaged by the September 2001 terror attacks.
1.3 PURPOSE
This document presents the safety procedures and practices to be followed during all Abatement
Phase site activities to ensure the safe completion of tasks. The procedures and practices herein
are designed to prevent occupational injuries and exposures to chemical, physical and biological
hazards to workers at the Site. The procedures are presented to ensure compliance with all
applicable government agencies and regulations, including requirements and protocols
established by: the Occupational Safety and Health Administration (OSHA); the National
Institute of Occupational Safety and Health (NIOSH); the United States Environmental
Protection Agency (USEPA); the New York State Department of Conservation (NYSDEC); the
State of New York, New York State Department of Labor (NYSDOL); the New York City
Department of Environmental Protection (NYCDEP); and the City of New York.
5
NYC-WTC 000134981
OCR can misread numbers and units. Confirm readings against the page image before using them.