EPA work plan review, 133-135 and 21-23 buildings, August 2005

Machine-extracted title · confidence 75%

EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.

NYC-WTC_000134871–000135144
Page image
Scanned page image, NYC-WTC_000134979
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part III — Health & Safety Plan 133-135 Greenwich Street(21-23 Thames Street Airtek Project 05-0701 — Rev 1, August 11, 2005

1.0 INTRODUCTION

This Health and Safety Plan (HASP) presents the practices and procedures that the Contractor shall implement and enforce during the deconsthuction of the buildings located at 133-135 Greenwich/21-23 Thames Street in New York City (the Buildings). This HASP will be applicable to all persons entering the Buildings and to all persons working in and around the Buildings. The deconstruction of the Buildings will occur in two phases:

The Abatement Phase of the Deconstruction Project will occur while the work area is placed under negative pressure containment and includes the following general categories: (a) the general area cleanup of WTC dust and debris, (b) removal and disposal of installed porous and certain non-porous building materials and components, (c) cleaning and salvage of certain installed non-porous building equipment and components, (d) removal of building materials containing asbestos which were present in the Building prior to September 11, 2001 (referred to herein as "ACBM"), primarily within the Building interior, (e) packaging of asbestos and other regulated waste at generation points, movement of containers to the decontamination unit and movement of decontaminated containers to waste loading by hand.

The proposed clean-up and abatement will be conducted so that the Building can be safely deconstructed in compliance with applicable law to allow for redevelopment of the site. This HASP covers the activities to be undertaken as part of the Abatement Phase; a separate HASP will address Conventional Demolition Phase Deconstruction activities.

The Contractor shall be supported on this project by the Owner's Environmental Consultant who will provide environmental testing, air sampling and asbestos project monitoring and serve the function of Environmental Consultant/Project Monitor.

1.1 BACKGROUND

The events of September 11, 2001, which caused the destruction of the WTC Towers generated massive debris and dust. While not physically damaged, some of this WTC dust entered into the 133-135 Greenwich/21-23 Thames Street Buildings. The Buildings had been partially reoccupied after September 11, 2001 following clearance of debris and unspecified cleaning to permit re- occupancy.

1.1.1 Environmental Characterization

The Owner contracted with Airtek Environmental Corp. to conduct Asbestos Surveys and General Building Characterization for the 133-135 Greenwich/21-23 Thames Street buildings. Due to the proximity of these buildings to the WTC, and the extensive environmental tests carried out at the adjacent 130 Liberty Street (Deutsche Bank) Building, it is assumed for the purpose of this HASP that similar potentially contaminated WTC dust is present at this site. The settled dust in and on the Building may contain elevated levels of five COPCs designated by the United States Environmental Protection Agency (USEPA) as being associated with the WTC

n

NYC-WTC 000134979

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134979Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →