NYC 9/11 Public Portal Document
Part III — Health & Safety Plan
133-135 Greenwich Street(21-23 Thames Street
Airtek Project 05-0701 — Rev 1, August 11, 2005
1.0 INTRODUCTION
This Health and Safety Plan (HASP) presents the practices and procedures that the Contractor
shall implement and enforce during the deconsthuction of the buildings located at 133-135
Greenwich/21-23 Thames Street in New York City (the Buildings). This HASP will be
applicable to all persons entering the Buildings and to all persons working in and around the
Buildings. The deconstruction of the Buildings will occur in two phases:
The Abatement Phase of the Deconstruction Project will occur while the work area is placed
under negative pressure containment and includes the following general categories: (a) the
general area cleanup of WTC dust and debris, (b) removal and disposal of installed porous and
certain non-porous building materials and components, (c) cleaning and salvage of certain
installed non-porous building equipment and components, (d) removal of building materials
containing asbestos which were present in the Building prior to September 11, 2001 (referred to
herein as "ACBM"), primarily within the Building interior, (e) packaging of asbestos and other
regulated waste at generation points, movement of containers to the decontamination unit and
movement of decontaminated containers to waste loading by hand.
The proposed clean-up and abatement will be conducted so that the Building can be safely
deconstructed in compliance with applicable law to allow for redevelopment of the site. This
HASP covers the activities to be undertaken as part of the Abatement Phase; a separate HASP
will address Conventional Demolition Phase Deconstruction activities.
The Contractor shall be supported on this project by the Owner's Environmental Consultant who
will provide environmental testing, air sampling and asbestos project monitoring and serve the
function of Environmental Consultant/Project Monitor.
1.1 BACKGROUND
The events of September 11, 2001, which caused the destruction of the WTC Towers generated
massive debris and dust. While not physically damaged, some of this WTC dust entered into the
133-135 Greenwich/21-23 Thames Street Buildings. The Buildings had been partially reoccupied
after September 11, 2001 following clearance of debris and unspecified cleaning to permit re-
occupancy.
1.1.1 Environmental Characterization
The Owner contracted with Airtek Environmental Corp. to conduct Asbestos Surveys and
General Building Characterization for the 133-135 Greenwich/21-23 Thames Street buildings.
Due to the proximity of these buildings to the WTC, and the extensive environmental tests
carried out at the adjacent 130 Liberty Street (Deutsche Bank) Building, it is assumed for the
purpose of this HASP that similar potentially contaminated WTC dust is present at this site. The
settled dust in and on the Building may contain elevated levels of five COPCs designated by the
United States Environmental Protection Agency (USEPA) as being associated with the WTC
n
NYC-WTC 000134979
OCR can misread numbers and units. Confirm readings against the page image before using them.