..akin. I'nm Iilevatiuns fall Pnmx^tiun Fn11 ProtnYta,n Plan
H.vt Stress I Ira monitorin g
Cold'titrrss ( old mtmiturin••
Slip Irip Full Ikmwk~. . in
Liftirn• 1'r ,r liftinu t.whna uts
liln Irinl S'gtnrs iLtri.tt1 SnI.+tc. Lt )I() Lark-t)uL I'aulhtt Pm mm
Pitch P,ents 31aterials Ilundlintt
I fatal T t•is Pr . r un t.whn' uts
l,. d ( I,ar Imale uate f.i •htin • Illumination
(I run limitrd dtsinnatd ev rk r
Tuntnrt'mnt and f lamtckvts ~7at.rrJly
atrf'wo to tadlilate the crook l t,{ Iln' f r elan h,.nt
10 man-host and the (.rune and irtuallatiun ((IM's and ashestns t'''ananmitatu n Pn' trJua
.otcrctc chttto Ikrranl ('omnwmcdi .n PPE
f int.ru,r txntnie dntte and 29 CFR 1910.120 (a)
umstnutiom ►
9
Structural int,,riR PE
SttutturJl.httn E.
fm: wti„n
\nine I Inuring patnuke
-
Urn, Iition Folltm denu,lition .kart
5mn^d lt:tr.Jnitaty Follow par xr ptt.ctsums
klateriuls httndlin • Materials lraudlin • ________________________
t nmesl.iftinu li ui xhu ('runt liftine caret.
*As described in Section 2.5
** Procedures are part of Contractors Project Safety Plan
***Per 2.72
+Due to enclosure and unknown airborne silica concentrations work will have to be performed using PAPR with P100
cartridges and local exhaust ventilation or work will be performed under
Level B until air sampling allows otherwise.
If site conditions change during the course of the deconstruction project, the
Environmental Consultant will evaluate the new conditions and discuss appropriate
amendments to the HASP with the Contractor. The proposed amendments shall be
reviewed and approved by the Environmental Consultant's CIH and the Contractor
• Project Manager.
2.2.3 Physical Hazards
While the buildings at 133-135 Greenwich/21-23 Thames Street suffered no significant
damage from the WTC Collapse, numerous physically hazardous conditions exist related
to the deteriorated, run-down condition of much of the space in these buildings. These
hazards include damaged electrical sources and components, falling hazards due to
openings in the floors, or the possibility of materials falling from overhead. The primary
physical hazards that may be encountered during this project are related to the Phase I
activities and include: heavy equipment operation; excessive noise; excessive heat or
cold; inclement weather; manual lifting/handling of heavy objects; poor housekeeping;
rough terrain; compromised structural integrity; traffic; cranes, hoists and other lifting
equipment;, aerial lifts and manlifts; working at elevation; use of scaffolding; hazardous
materials use; potential utility and electrical sources; use of hand and power tools; slips
and falls; etc.
Due to the existence of these hazards, the Contractor shall ensure that all site employees
receive hazard awareness training. Additionally, the Contractor shall insure that
Subcontractors perform the following operations under the direct on-site supervision of
OSHA Competent Persons (provided by the Subcontractors for each task as necessary):
• General Construction (29 CFR 1926.20)
. • Unsanitary Conditions (29 CFR 1926.27)
• Rigging (29 CFR 1926.251)
The Copper Group —133-135 Greenwich Street & 21-23 Thames Street
Alrtek Project 05=0710 - Phase I HASP 6-8-05 Page 17 of 40
NYC-WTC 000127754