NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
9 shared non-person entities · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
NYC-WTC_000127738–000127777Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
• ..akin. I'nm Iilevatiuns fall Pnmx^tiun Fn11 ProtnYta,n Plan H.vt Stress I Ira monitorin g Cold'titrrss ( old mtmiturin•• Slip Irip Full Ikmwk~. . in Liftirn• 1'r ,r liftinu t.whna uts liln Irinl S'gtnrs iLtri.tt1 SnI.+tc. Lt )I() Lark-t)uL I'aulhtt Pm mm Pitch P,ents 31aterials Ilundlintt I fatal T t•is Pr . r un t.whn' uts l,. d ( I,ar Imale uate f.i •htin • Illumination (I run limitrd dtsinnatd ev rk r Tuntnrt'mnt and f lamtckvts ~7at.rrJly atrf'wo to tadlilate the crook l t,{ Iln' f r elan h,.nt 10 man-host and the (.rune and irtuallatiun ((IM's and ashestns t'''ananmitatu n Pn' trJua .otcrctc chttto Ikrranl ('omnwmcdi .n PPE f int.ru,r txntnie dntte and 29 CFR 1910.120 (a) umstnutiom ► 9 Structural int,,riR PE SttutturJl.httn E. fm: wti„n \nine I Inuring patnuke
- Urn, Iition Folltm denu,lition .kart 5mn^d lt:tr.Jnitaty Follow par xr ptt.ctsums klateriuls httndlin • Materials lraudlin • ________________________
t nmesl.iftinu li ui xhu ('runt liftine caret. *As described in Section 2.5 ** Procedures are part of Contractors Project Safety Plan ***Per 2.72 +Due to enclosure and unknown airborne silica concentrations work will have to be performed using PAPR with P100 cartridges and local exhaust ventilation or work will be performed under Level B until air sampling allows otherwise.
If site conditions change during the course of the deconstruction project, the Environmental Consultant will evaluate the new conditions and discuss appropriate amendments to the HASP with the Contractor. The proposed amendments shall be reviewed and approved by the Environmental Consultant's CIH and the Contractor • Project Manager.
2.2.3 Physical Hazards
While the buildings at 133-135 Greenwich/21-23 Thames Street suffered no significant damage from the WTC Collapse, numerous physically hazardous conditions exist related to the deteriorated, run-down condition of much of the space in these buildings. These hazards include damaged electrical sources and components, falling hazards due to openings in the floors, or the possibility of materials falling from overhead. The primary physical hazards that may be encountered during this project are related to the Phase I activities and include: heavy equipment operation; excessive noise; excessive heat or cold; inclement weather; manual lifting/handling of heavy objects; poor housekeeping; rough terrain; compromised structural integrity; traffic; cranes, hoists and other lifting equipment;, aerial lifts and manlifts; working at elevation; use of scaffolding; hazardous materials use; potential utility and electrical sources; use of hand and power tools; slips and falls; etc.
Due to the existence of these hazards, the Contractor shall ensure that all site employees receive hazard awareness training. Additionally, the Contractor shall insure that Subcontractors perform the following operations under the direct on-site supervision of OSHA Competent Persons (provided by the Subcontractors for each task as necessary): • General Construction (29 CFR 1926.20) . • Unsanitary Conditions (29 CFR 1926.27) • Rigging (29 CFR 1926.251)
The Copper Group —133-135 Greenwich Street & 21-23 Thames Street Alrtek Project 05=0710 - Phase I HASP 6-8-05 Page 17 of 40
NYC-WTC 000127754
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
9 shared non-person entities · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
35 shared non-person entities · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
23 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
11 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
23 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
41 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
13 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
11 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
22 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
17 shared non-person entities · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗22 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000148621
Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.
Cited alongside this record in an Ask answer