NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
NYC-WTC_000164671–000164730
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
World Trade Center Emergency Project Environmental, Safety, and Health Plan Draft - Revision A 30 September 2001
3.1.7 Respiratory Protection
A written respiratory protection program meeting the requirements of 29 CFR 1910.134 is required for each contractor using respiratory protection at the site. Contractors shall submit a copy of their written respiratory protection program for review by the DDC/Site ES&H director or designee prior to respirator use.
3.2 CONFINED SPACE ENTRY
All confined space entries shall be controlled through the use of a permit system (Note: this includes spaces that meet the OSHA definition of nonpermit-required confined spaces). Contractors shall comply with the Confined Space Entry requirements specified in 29 CFR 1910.146. Contractors shall comply with their own confined space entry program, the use of which requires review and approval by the WTC Emergency Site ES&H director or his designee.
3.3 EXCAVATION, TRENCHING AND PENETRATION
Intrusive soil activities are defined as “any man-made disturbance of the ground such as a cut, cavity, excavation, trench, or depression in the earth’s surface formed by earth removal, regardless of dimensions, which produces unsupported soil conditions.” All intrusive soil activities shall be conducted in accordance with 29 CFR 1926, Subpart P. Contractors shall ensure that all personnel performing work in an excavation have awareness training which includes a discussion of the hazards and control measures associated with underground utilities, cave-ins, access and egress, use of protective systems (benching, shoring, sloping, trench boxes), potential atmospheric hazards, equipment operations hazards, water accumulation hazards, stability of adjacent structures, and the contractors excavation inspection program. Contractors shall assign a competent person to each excavation where a hazard to personnel, equipment or facilities may exist. The competent person shall be available on-site (at the excavation area as necessary) and involved in all important aspects of planning and executing excavation work including soil classification, identification and use of protective systems and permit approval. Contractors shall ensure that all employees in an excavation are protected from cave-ins by an adequate protective system for all excavations which are at least 5 feet or deeper, and for excavations less than 5 feet where examination by a competent person indicates a potential for cave-ins. A JHA shall be developed for personnel who are working in and around an excavation that is 4 feet or deeper or where the potential for cave-in is present. Excavated materials (spoils) shall be placed a minimum distance of 2 feet from the edge of the excavation. A means of egress shall be provided, ever 25 feet of lateral distance, from all excavations 4 feet or greater.
39
NYC-WTC_000164709
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
24 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
17 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000142247
Generic DEP form from Box 06 with illegible content regarding environmental services.
11 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
24 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
33 shared non-person entities · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149199
Department of Environmental Protection advisory letter dated October 25, 2001, addressed to residents of Lower Manhattan.
18 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145345
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
33 shared non-person entities · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
13 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
15 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
15 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153096
Interagency memo circulating EPA revisions for NESHAP and related programs with request for legal and agency comments.
14 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000124224
Letter from Brookfield requesting approval to open 1 Liberty Plaza for occupancy on October 22, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer