GENERAL EXCEPTIONS; R£; Aid, WORK REQUIRING STREET EXCAVATIONS
Due to the possibility of underground utilities, e.xisting water mains, pipe lines, fiber optic cables, telephone lines, relocation & replacement of existing gas mams, conduit ducts, rock excavation, dewatering removal of existing soil determined " NOT SUITABLE FOR BACKFILL" by the I NA’'CDOT or NYCDEP and furnishing suitable soil, contaminated soil removal & disposal, etc., we hereby take exception to and accept absolutely no responsibility for the cost of relocating these utilities and performing any additional work in order to perform the installation required by our contract. We will however, cooperate in every way with the governing utility to negotiate an amicable means for these utilities to be relocated by their forces, or by our forces subsequent to an agreed change order in writing prior to beginning any additional work.
Dewatering and rock excavation if required is not included in this proposal and if required will be performed by our forces and paid for on a time and materials basis or another method acceptable to both parties.
In the event a change order is required and can not be negotiated at the time it is discovered and 'we are required to close up any excavations, there will be an additional charge for remobilization of our forces when an agreed change order has been signed both parties.PIease be aware the job will not continue until the additional work authorization is signed.
Contractor: JgC CONSTy.LCTlON CORPORATION Contractor Signature: David Ciinnizzaro Print Name & Title: David Cannizzaro/Prcsidcnt Date-
Agreed & Accepted by: PnntName & Title: Date:
NYC-WTC_000182199
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
1 shared topics · similarity 0.921
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared topics · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
1 shared topics · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099547
Agreement between the City of New York and a landowner to remove foreign material from building exteriors near the former World Trade Center site.
Similar document embedding; no shared entity or topic indexed. · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
Similar document embedding; no shared entity or topic indexed. · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127520
Official notice urging building owners to participate in the DEP program for cleaning World Trade Center debris from exterior surfaces.
Similar document embedding; no shared entity or topic indexed. · similarity 0.893
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
Similar document embedding; no shared entity or topic indexed. · similarity 0.893
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
Similar document embedding; no shared entity or topic indexed. · similarity 0.893
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102407
Header page of legal correspondence from counsel regarding environmental remediation at 83 Maiden Lane in October 2002.
Similar document embedding; no shared entity or topic indexed. · similarity 0.893
machine-extracted · confidence unavailable · Check page ↗Similar document embedding; no shared entity or topic indexed. · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.944 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.942 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similarity score 0.942 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Similar indexed content
NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
Similar indexed content
NYC-WTC_000165808
Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.
Similar indexed content
NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
Similar indexed content