n Scope of Work:

• Remove and replace sand in playground area. Removal by use of vacuum truck. (See note A below) 48’x26’x8”=30cy to include demolition and restoration of pipe railings and fence required to access work area for loading & mstallaiion for new sand approx, 30 cy $13,500.00 • Remove and replace sand in volleyball court area. Removal by use of vacuum truck. (See note A below)150x80xl2=300cy to include demolition and restoration of pipe rai lings and fence required to access work area for loading & installation for new sand approx. 250 cy 525,000,00 • Remove top 6” of soil in bocce court area. Removal by use of bobcat. (See note A below) 55'x30'xg" - 40 cy to include demolition and restoration of pipe railings and fence required to access work area for loading &. installation for new sand approx. 40 cy 510,500.00 • Replace damaged railing along Pier 25. Remove and replace all wood top handrails 500 If. Power wssb entu'c i'ai’ing along pier- Rcpair damaged curb as needed 597,500.00 • Excavate and remove temporary asphalt roadway. Excavate and remove all gravel under temporary roadway. Excavate and remove of soil beneath gravel to elevati on equal to bottom of the adjacent paving stone. (Between N. Moore St. and School) (See note A below) $235,200.00 • Remove debris, patch as needed and-pewsr-wash temporary bide path. Paint lines as required to match the existing bike patli (between N, Moore St. and School) (See note A below) $15,500.00 • Note A; All debris and sand being removed shall be coordinated with Weeks Marine for loading up and removal via barge. This removal work to take place during the week following the last bnickload from the WTC Recovery Site. Tentatively the last load is scheduled for 5/11/02, therefore removal to take place between 5/12/02 and 5/17/02 (date of crane being demobilized from Pier 25). • All rep air and replacement work to occur following the dem obilization of the crane (5/17/02) from Pier 25. All repair/replacement work to be complete by June 7,2002. • Working hours at pier 25 are between 7 am and 7pm. • Contractor to enroll in NYCDDC OGIP program with Liberty Mutual insurance. • No sales tax to be included in the proposal.

CITY_21MC1OO_OO325918O

NYC-WTC_000205170

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000205170Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →