NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 55/No folder label
Document / 283 pages

EPA review letter, 133-135 Greenwich Street

Machine-extracted title · confidence 90%

US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.

NYC-WTC_000134132–000134414
Page image
Scanned page image, NYC-WTC_000134384
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Part III ~ Health & Safety Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 — Rev 3, August 29, 2005 ork Site Work (Fencing, Back filling, Paving, and Drainage) ined: Trackloaders, Skidsteer Loaders, Small Tilt Sladers, Vibratory Rollers, Roller Compactor Truck Paving. Asphalt Paving Equipmant, Smooth Barrel Roller, Forklift, Crane, Area lift PPE Preventative Suabtask # Activities Regalrsments Borards Mechantstes Procedure “Moving Equipment ® Hand signals ] Installation of Site fences Level D *Open excavation * Banicadss See Items 1-5 Below 2 Back filling Lavel D *Open excavation © Banicades See Items 1-5 Below * Evacuation of excavations before backfilling bl watch 3 Paving Level D Open excavation * Barricades See Items 1-5 Below ® Evacuation of excavations before backfillms = watch “Moving Equipment * Hand signals 4 Drainage Lewi D *Open excavatien ®* Bamicades Seo Items 1-5 Below * Evacuation of excavations before backfilling 5 Safaty watch General Precautions- Site to be detennined as the detailed scope and schedule ue developed. specific precautions img iss prt permet’ plo hp ik i atl whe ~NYC-WTC_000134384 The operators of any truck employed in backfilling operations the load. No backfill shall commance until all workers are clear of the working aress. The operators of any machines or velucles being used in backfilling operations shall keep other employees in sight at all shall ensure that all workers are in the clear before ila or oe No equipment shall back closer than | mater to the edge of my excavation and this set-back shall be increased conmenswrately with the depth of the excavation wiles trenching sleds or other retention devices are employed No equipment shall dump material closer than 1 meter to the edge of an excavation. 17

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134384Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →