Part III — Health & Safety Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 — Rev 1, August 11, 2005
Table 2-1
Task 1: Environmental Consultant Air Monitoring and Waste Characterization
Equipment Required: Air sampling equipment, Waste Characterization e.g. (scoops, bowls, scale, safety blades,
sample containers), PPE
PP Preventative
Snbtask # Activities Hazards Procedure
uirements Mechanism
Mobilization (Transporting
I employees, materials and equipment Level D Use of vehicles Vehicle and driving
safety Contractor Specific
to site)
Lifting Proper lifting techniques Contractor Specific
2 Unloading equipment on the ground Level D Site Security Site Security Contractor Specific
level Pinch points Materials Handling Contractor Specific
Biological hazard Contractor Specific
Insects
monitoring
Chemical COPC Hazard Communication
Contractor Specific
Heat Stress Heat monitoring Contractor Specific
Cold Stress Cold monitoring Contractor Specific
3 Waste Characterization Sampling Level C*** 511p, trip, fall Housekeeping Contractor Specific
Trespassers Site Security Contractor Specific
Pinch Points Materials Handling Contractor Specific
Hand Tools Proper use techniques Contractor Specific
Inadequate li tin Illumination Contractor Specific
Asbestos, Silica& Avoidance Monitoring
Metals Contractor Specific
Noise Hearing Protection Contractor Specific
Heat Stress Heat monitoring Contractor Specific
Cold Stress Cold monitoring Contractor Specific
4 Area air sampling during abatement Slip. nip, fall Housekeeping Contractor S cific
Level C***
activities Trespassers Site Security Contractor Specific
Pinch Points Materials Handling Contractor S cific
Hand Tools Proper use techniques Contractor Specific
Inadequate lighting Illumination Contractor Specific
Mold Avoidance Contractor specific
Asbestos Avoidance Monitoring Contractor Specific
rd Communication
Chemical COPC Contractor Specific
PPE
Heat Stress monitoring Contractor Specific
Cold Stress monitoring Contractor Specific
Slip, trip, fall Housekeeping Contractor Specific
5 Clearance air sampling Level C***
Trespassers Security Contractor Specific
Pinch Points WMatenialsHandling Contractor S ific
Hand Tools echni ues Contractor Specific
Inadequate lighting Illumination Contractor Specific
Asbestos Avoidance Monitoring Contractor Specific
*As described in Section 2.5
** Procedures are part of Contractors Safety Program
***Per 2.7.2 Personal Monitoring