EPA work plan review, 133-135 and 21-23 buildings, August 2005

Machine-extracted title · confidence 75%

EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.

NYC-WTC_000134871–000135144
Page image
Scanned page image, NYC-WTC_000134993
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part III — Health & Safety Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 — Rev 1, August 11, 2005

Table 2-1

Task 1: Environmental Consultant Air Monitoring and Waste Characterization Equipment Required: Air sampling equipment, Waste Characterization e.g. (scoops, bowls, scale, safety blades, sample containers), PPE

PP Preventative Snbtask # Activities Hazards Procedure uirements Mechanism Mobilization (Transporting I employees, materials and equipment Level D Use of vehicles Vehicle and driving safety Contractor Specific to site) Lifting Proper lifting techniques Contractor Specific 2 Unloading equipment on the ground Level D Site Security Site Security Contractor Specific level Pinch points Materials Handling Contractor Specific Biological hazard Contractor Specific Insects monitoring Chemical COPC Hazard Communication Contractor Specific Heat Stress Heat monitoring Contractor Specific Cold Stress Cold monitoring Contractor Specific 3 Waste Characterization Sampling Level C*** 511p, trip, fall Housekeeping Contractor Specific Trespassers Site Security Contractor Specific Pinch Points Materials Handling Contractor Specific Hand Tools Proper use techniques Contractor Specific Inadequate li tin Illumination Contractor Specific Asbestos, Silica& Avoidance Monitoring Metals Contractor Specific Noise Hearing Protection Contractor Specific Heat Stress Heat monitoring Contractor Specific Cold Stress Cold monitoring Contractor Specific 4 Area air sampling during abatement Slip. nip, fall Housekeeping Contractor S cific Level C*** activities Trespassers Site Security Contractor Specific Pinch Points Materials Handling Contractor S cific Hand Tools Proper use techniques Contractor Specific Inadequate lighting Illumination Contractor Specific Mold Avoidance Contractor specific Asbestos Avoidance Monitoring Contractor Specific rd Communication Chemical COPC Contractor Specific PPE Heat Stress monitoring Contractor Specific Cold Stress monitoring Contractor Specific Slip, trip, fall Housekeeping Contractor Specific 5 Clearance air sampling Level C*** Trespassers Security Contractor Specific Pinch Points WMatenialsHandling Contractor S ific Hand Tools echni ues Contractor Specific Inadequate lighting Illumination Contractor Specific Asbestos Avoidance Monitoring Contractor Specific

*As described in Section 2.5 ** Procedures are part of Contractors Safety Program ***Per 2.7.2 Personal Monitoring

12

NYC-WTC 000134993

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134993Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →