Part III — Health & Safety Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701— Rev 3, August 29, 2005
Consultant shall include monitoring for visible emissions as detailed in the Environmental
Monitoring Specification.
2.2 HEALTH AND SAFETY HAZARD ANALYSIS AND RISK ASSESSMENT
2.2.1 Preliminary Evaluation
The work to be conducted at 133-135 Greenwich/21-23 Thames Street comprises construction
activities and, as such, falls under Title 29 of the Code of Federal Regulations, Part 1926 (29
CFR 1926), the OSHA Construction Standard.
An evaluation of the anticipated general work activities was performed (discussed later in this
section) that included a Hazard Analysis for each general tasklactivity to identify associated
hazardous conditions, appropriate employee protection methods and PPE requirements. The
evaluation of potential site conditions and activity hazards is an ongoing process and shall
continue throughout the duration of the project.
Potential hazards during the Abatement Phase effort include the following
• Physical — Excessive noise; inclement weather; heat stress; cold stress; manual lifting;
slips and structural integrity; working at elevation; electrical safety; heavy
falls;
equipment operation; and other general construction hazards.
• Chemical — Asbestos, silica, PAHs, dioxins, man-made vitreous fibers (MMVF),
antimony, cadmium, nickel, lead, barium, chromium, zinc, manganese, copper,
beryllium, PCBs, mercury, copper, zinc, cristobalite and quartz.
• Biological — Mold; rodents; insects.
• Radiological — None anticipated.
2.2.2 Task Hazard Analysis
J
The scope of work for the 133-135 Greenwich/21-23 Thames Street project consists of five (5)
general tasks, as follows:
Task 1: Environmental Consultant monitoring including work area air sampling during
preparation decontamination and demolition activities; clearance air sampling upon completion
of asbestos and COPC abatement and removal activities; and waste characterizatipn sampling.
Task 2: Maintain temporary services including water, fire protection and GFCI protected
S
electrical.
Task 3: Preparation for and general area cleanup of WTC dust and debris, which as stated by the
regulators must be treated as asbestos (at a minimum) and which may contain other COPCs;