NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 35/90 MAIDEN LANE 1001016, 42/36
Document / 2 pages

Asbestos inspection log, 90 Maiden Lane facade, July 2002

Machine-extracted title · confidence 95%

Daily inspection log recording facade cleanup and air sampling activities at 90 Maiden Lane on July 7, 2002.

NYC-WTC_000102496–000102497

Folder label: “90 MAIDEN LANE 1001016, 42/36

Page image
Scanned page image, NYC-WTC_000102497
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • Asbestos Inspection Report Premise No. 90 MAIDEN LANE Inspector Dennis Antzoulatos Inspection Date: 07-07-02 Page Z of z SUNDAY JULY T, 2002 (CONTINUED) 3:30PM _CONSTRUCT PLASTIC DYKE FOR THE COUECTION OF ANK RUW-OFF WATER FROM THE FACADE CUEANUP BELOL THE SIDEWALL BRIDGE. 5:30pм DO ELEMO OF WARREN E PANZER (CNDUCTS A VISUAL INSPECTION OF TI SURFACES BELEL THE SIDEWALK BRIDGE AND OBSERUES N GLEANET FACADE VISIBUE WTC DEBRIS. 6:00PM WORKERS HAUE DISMANTLED THE DYKE, REMOVED ALL WASTE BAGS AND LEAVE TUE WORKSITE. THE CUEAN UP PROSECT AT THIS PREMISE IS NOW COMPLETE. NYC-WTC_000102497

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102497Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →