NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 35/90 MAIDEN LANE 1001016, 42/36
Document / 2 pages

Asbestos inspection log, 90 Maiden Lane facade, July 2002

Machine-extracted title · confidence 95%

Daily inspection log recording facade cleanup and air sampling activities at 90 Maiden Lane on July 7, 2002.

NYC-WTC_000102496–000102497

Folder label: “90 MAIDEN LANE 1001016, 42/36”

Page image
Scanned page image, NYC-WTC_000102497
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • Asbestos Inspection Report Premise No. 90 MAIDEN LANE Inspector Dennis Antzoulatos Inspection Date: 07-07-02 Page Z of z SUNDAY JULY T, 2002 (CONTINUED) 3:30PM _CONSTRUCT PLASTIC DYKE FOR THE COUECTION OF ANK RUW-OFF WATER FROM THE FACADE CUEANUP BELOL THE SIDEWALL BRIDGE. 5:30pм DO ELEMO OF WARREN E PANZER (CNDUCTS A VISUAL INSPECTION OF TI SURFACES BELEL THE SIDEWALK BRIDGE AND OBSERUES N GLEANET FACADE VISIBUE WTC DEBRIS. 6:00PM WORKERS HAUE DISMANTLED THE DYKE, REMOVED ALL WASTE BAGS AND LEAVE TUE WORKSITE. THE CUEAN UP PROSECT AT THIS PREMISE IS NOW COMPLETE. NYC-WTC_000102497

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102497Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →