Asbestos inspection log, 101 Maiden Lane facade cleanup, Sept 2002

Machine-extracted title · confidence 94%

Inspection log recording scaffold erection and cleaning of the east and south facades at 101 Maiden Lane in early September 2002.

NYC-WTC_000100005–000100006

Folder label: “101 MAIDEN LANE 1001122, 68/10

Page image
Scanned page image, NYC-WTC_000100005
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. Floor Zip ROOF $ FACADE 10038 Inspector Dennis Antzoulatos 101 MAIDEN Borough 1 Building Type COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address 1248 Ralph Avenue, Brooklyn State Phone 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person LANE Block 68 Lot 10 Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Inspection Date: AS NOTED Squad # TBadge # N/A A020 Photos Taken Ves No Address City State Zip Phone Time of Inspection from: AS NOTED WEDNESDAY SEPTEMBER 4 2002 HANGING SCAFFOLD IS ERECTET IN PREPARATION FOR THE FACADE CLEAN LP ON THE EAST (PEARL SIPEET) FACE OF THE BUILDING. THE FACADES DF THE BUILDING CONTAINE SEVERAL AREAS OF CRACKER AND LOOSE BRICK. DURING THE ERECTION OF THE HANGING SCAFFOLD FOUR LoaSE BRICKS BECAME DISLODGED. NO INURIES OCCURRED 1S A RESULT OF THE FALING BRICR. FRIDAY SEPTEMBER 6 2002 THE CLEAN UP OF THE ROCF WORK AREA BEGINS AFTER THE INSTALLATION OF CeITICME. SATURDAY SEPTEMBER = 2002 TUE CUEAN UP OF THE EST (PEARL STREET) FACADE AND ONE HALF OF THE SOUTH (MAIDEN LANE) FACADE WAS CONDUCTED TODAL. DUE TO SEVERAL ACEAS OF LOOSE AND CHACKED BIICK NO FOWER LASHING OF THE FACADE SURFACES OCCURRED. AIR SAMPUNG FOR THIS PORTION OF THE CLEAN UP WAS PERFORMET BY LUIS SOTO (CERTIFICATE # AM 00 20894 EXP 03/03). CUEAN UP ACTIVITIES ON THE ROOF AOCURED SIMULTANEOUSLT: AIR MONITORING FOR TUAT PORTION OF THE CIEANUP WAS PERFORMED Bi PONALO KING I CERTIFICATE # AH 98-20226 EXP 10loz). SUNDAY SEPTEMBER B 2002 THE CUEAN UP OF THE SECONO HALF OF THE SOUTH CMAIDEN LANE) FACADE WAS CONDUCTED TODAY. THE CUAN UP OF THE ROOF WAS COMPLETED TODAY. ALR MONITORING FOR THE FACADE CUCAN UP WAS PERFORMED BY Wis SoTo, All MONMORING FOR THE ROCF CLEAN UP WAS PERPORMED BY NYC-WTC_000100005

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100005Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →