NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 53/15 DUTCH STREET 1001197, 78/7504
Document / 2 pages

Asbestos inspection and cleanup memo, 15 Dutch Street, June 2002

Machine-extracted title · confidence 95%

Memo documenting asbestos inspection and roof cleanup procedures at 15 Dutch Street on June 24-26, 2002.

NYC-WTC_000130821–000130822

Folder label: “15 DUTCH STREET 1001197, 78/7504

Page image
Scanned page image, NYC-WTC_000130821
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • - Asbestos Inspection Report Premise No. 15 DUTCH STREET FOOF AND ROOF FACADE Zip 10038 Borough Inspector Building Type Dennis Antzoulatos MIXED USE Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address 228 East 45 Street City New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block T8 Lot 7504 Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Inspection Date: AS NOTED Squad # TBadge # N/A A020 Photos Taken Yes/ No Address City State Zip Phone Time of Inspection from: AS NOTED MONDAY JUNE 24 2002 B:00AM WORKERS BEGIN THE CLEANUP OF THE ROOE AREA. THE CUEANUP OF I DUTCH WILL OCCUR SIMULTANEDUSLY. FOR THE PURPOSES OF AIR MONITORING THE ROOF AREAS OF THESE TUC BUILDINES WILL BE CONSIDERED ONE WOMK AREA. A REMOTE DECUN LOCATED ON THE ROCF STREET WIU BE USED. AIR SAMPUNG WIL BE CONDUCTED BY JOWN BOYD (CERTIFICATE # AH 90-05530 EXP 01/03) OF COARREN 4 PANZER ENGINEERS. JUESDAY 8:00AM- 8:00PM JUNE 2S 2002 THE CLEAN UP OF THE POOF CONTINUES AS PER THE APPROVED WORK PROCEDURES. THURSDAY JUNE 21 2002 I CONDUCT A VISUAL INSPECTION OF THE CUEANED WORK APEAS ALONG WITH JOHN BOYD OF WAPPEN & PANZER. WORK AREA IS FREE OF VISIBLE WITC DEBRIS EXCEPT FOR THE AREA UNDERNEATH. THE ROOF DECK. WORKERS VACUUM BUUK DEBRIS. BELOW THE DECK UP TO A DEPTR OF FIVE FEET ALL APCUND THE DECK. FURTHER CUEANING/ VACUUMING IS NOT POSSIBLE WITHOUT THE DISMANTLING OF THE DECK. AS A RESULT A FINE LAYER OF DEBRIS MAY BE PRRSENT. THIS IS NOTED.. FOR THE RECORO. SATURDAL JUNE 20 2002 1:00AM WORKERS CONSTRUCT DYKE ON THE SIDEWALK TO COLECT WATER RUN OFF FROM THE FACADE CLEAN UP. THE FACADE CLEAN UP OF | DUICH WILL BE DONE SIMULTANEDUSUL. FOR THE PURROSES OF AIR MONITORING THE FACADES (EXST FACADES) OF THESE TUC BUILDINGS WILL BE CONGIDERED ONE WOEK AREA. LARRY BAER OF WARREN & PANZER CNL PEREORM THE ALE MONITORING, FIVE SAMPLES WILL BE RUN. 4:00PM TVE EAST FACADES MANE BEEN CLEANED. NO VISIBLE WTC DEBRIS WAS OBSERUED ON THE CLEANED SURFACES. THE WEST FACADE CLEAN UP PEMAINS TO BE DONE. NYC-WTC_000130821

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000130821Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →