NYC 9/11 Public Portal Document
•.
Asbestos Inspection Report
Premise No.
182 BROADUSAL
• 12 JOMN STREET
Floor
Zip
Borough
Block
ROCF 9
FACADES
10038
1
65
Inspector
Building Type
Dennis Antzoulatos
COMMERCIAL
Contractor's Name
Benjamin Kurzban & Son Control
Address
City
1248 Ralph Avenue, Brooklyn
State
Phone
NY
11236 (718)531-2900
Laboratory Name
Warren & Panzer Engineers Inc.
Address
228 East 45 Street
City
Address
New York
State
Zip
Phone
State
NY
10017
(212) 922-0077
Contact Person
Inspection Date:
A5
NOTED
Lot
Squad #
TBadge#
19
Basis of Inspection
N/A
A020
Photos Taken
WTC Survey
Yes/No
Sample Number
N/A
Sample Number
N/A
Sample Number
N/A
Owner's Name
City
Zip
Phone
Time of Inspection from:
As NorED
SUNDAY
July 21 2002
CLEAN UP ACTIVITIES ON THE BROADIAG (WEST) FACADE WERE CONDUCTED. THE
ROOF CLEAN UP OF THE NEWSTAND ON THE CORNER OF BROADWAY AND JOHN STREET
WAS INCLUDED IN THIS PROSECT.
THE FACADE CUEANUP OF 180 BRRADUAR AND ITG
BROADUUAY OCCURRED SIMULTANEOUSLY. FOR THE PUEPOSES OF ARR MONITORING THE
BROADWAR FACADES OF THOSE THREE BULDINES WERE TREATED AS ONE CUORK AREA
ALe SAMPUNG FOR THIS WORK WAS CONDUCTED BY LUIS SOTO OF WARDEN I PANZER. A
DYKE WAS CONTIRUCTED T
COMECT RUN OFF WATER. A DECONTAMIBATION UNIT TRUÇK
WAS UTIUZED. THE CUEAN UP WAS PERFORMET USING A BOOM TRUCK. THE AREA
BEHIND THE GREEN AWNING WAS NOT ACCESDIBE FROM THE BOOM TRUCK AND LUIL BE
CUEANED ALONG WITH THE LOWER REOF CLEAN UP. AUL CUEANED FACADE SURFACES WETE
FREE OF VISIBLE WTC DEBRIS AT THE COMPLETION DF TODAT'S CIEANLUP ACTINITIES.
FRIDAS JUR 26 2002 TO THUESDAR ANGUST | 200Z
CUEAN UP ACTIVITIES ON THE LOWER AND HIGH ROOF SURFACES As WELL
AS THE INTERIOR FACADE SURFACES ARE CONDUCTED. AIR SAMPUNG FOR THIS
PORTION OF THE WORK WAS PERFORMED BU FESTY OSENLSEGIE ANO LUIS SOTO OF
WARPEN 4 PANZER ENGIEERS.
SUNDAY AUGUST 4 2002
THE CUEAN UP OF THE NORTH FACADE (JOMN STREET FACADE) WAS CONDUCTED
A PLASTIC DYKE WAE CONSTRUCTED TO CATCH RUN OFF WATER. A MOBILE DECON TRUCK
WAS USED. WATER WAS SUPPUED BS THE FIRE HUDRANTS IN TME AREA. THE AIR
CAS PORTORMED BY ELKIN CANO (AH 93 -02080 EXP 01/03) OF WARREN | PANZER
THE SHORT FACADE (2-STORY) WAS ELEAMED FIRST (8RM-2PM), THE TAULER FACADE WAS
CUEANED AFTER THE SMORI FACADE (2PM-8"PM). I CONDUCTED A VISUAL INSPECTION OF
THE CUEANED FACADE SURFACES AND OBSERUED NO VISIBLE WTC DEBRIS.
NYC-WTC_000122975
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000122975Source: NYC Law Department, mirrored locally
Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.