NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 53/15 DUTCH STREET 1001197, 78/7504
Document / 12 pages

Invoice for roof work at 15 Dutch Street, 2002

Machine-extracted title · confidence 50%

Invoice from Benjamin Kurzban & Son Control, Inc. for roof work completed at 15 Dutch Street.

NYC-WTC_000130799–000130810

Folder label: “15 DUTCH STREET 1001197, 78/7504”

Page image
Scanned page image, NYC-WTC_000130805
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • • • • Asbestos Inspection Report Premise No. OF ANr 200F FACADE Inspector Zip 10038 Dennis Antzoulatos 15 DUTCH STREET Borough Building Type MIXED USE Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip NY Phone 10017 (212) 922-0077 Contact Person Block T8 Inspection Date: AS NOTED Lot Squad # TBadge # 7504 N/A A020 Basis of Inspection Photos Taken WTC Survey Yes/ No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: AS NCTED WORKERS BEGIN THE CUEANUP OF THE ROCE AREA. THE CUEANUP OF T DUTCH WILL OCEUR SIMUUTANEDUSIY. FOR THE PURPOSES OF AIR MONITERING THE ROCF AREAS OF THESE TUK BÜILDINGS WILL BE CONSIDERED ONE WALK AREA. A REMCTE DECON LOCATED ON THE RAUF OF 15 DUTCH STREET WIL BE USED. AIR SAMPUNG WIL BE CONDUCTED BI JOHN BOYD (CERTIFICATE # AH 90-05530 EXP 01/03) OE WARREN I PANZER ENGIVEERS. IUESDAL JUNE 25 2002 8:00AM- 8:CCPM THE CUEANÚP UF THE POOF CONTINUES AS PER THE APPROVED LiCEK PROREDURES. IHURSDAY JUNE 2T 2002 1:00PM I CONDUCT A VISUAL INSPECTION OF THE CUEANED WORK APEAS ALONG WITH JOMN ZOYD OF WARREN E PANZER. WCRK AREA IS FREE OF VISIBLE CUTC DEBRIS EXCEPT FOR THE AREA UNDERNEATH THE ROCF DECK. WORKERS VACLUM BULK DEBRIS BELOL THE DECK UP TO A DEPTH FIVE FEET ALL ARCUND THE DECK. FURTHER CUEANINGI/ VACLUMING IS NCT POSSIBLE WITHOUT THE DISMANTLING OF THE DECK. AS A RESULT A FINE LAYER OF DEBRIS MAY BE PRESENT. THIS IS NOTED.FOR THE RECORO. SATUROAL. JUNE 29) 2002 1:00AM WORKERS CONSTROCT DYKE ON THE SIREWALK TO COLLECT WATER RUN OFF FROM THE FACADE CLEAN UP. THE FACADE CLEAN UF OF I DUTCH WILL BE DONE SIMULTANEGUSLY FOR THE PURPOSES OF AIR MONITORING THE FACADES (EAST FACADES) UF THESE TWC BUILDINGS WILL BE CONGIDERED ONE WAZK AREA. LARRY BAER OF WARCEN I PANZER CUNL PEREORM THEL ALE MONITORINE, FIVE SAMPLES WILL BE RUN. 4:00pM THE EAST FACADES MAVE BEEN CLEANED. NO VISIBLE WTC DEBRIS WAS OBSERUER ON THE CLEANED SURFACES. THE WEST FACADE CLEAN UP PEMAINS TO BE DONE. NYC-WTC_000130805

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000130805Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →