NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 53/DUTCH STREET 1001198, 78/26
Document / 8 pages

Invoice for Benjamin Kurzban & Son, 78 Dutch Street, 2002

Machine-extracted title · confidence 95%

Invoice from Benjamin Kurzban & Son Control Inc. for roof debris removal work at 78 Dutch Street.

NYC-WTC_000130754–000130761

Folder label: “DUTCH STREET 1001198, 78/26

Page image
Scanned page image, NYC-WTC_000130759
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • Asbestos Inspection Report •.. : Premise No. 7 DUTCH STREET Fioor Zip RO0F Borongh CAD Inspector Building Type Dennis Antzoulatos RESIDENTIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Block 78 Lot 26 Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Inspection Date: AS NOTED Squad # Badge # N/A A020 Photos Taken Tes/ No Address City State Zip Phone Time of Inspection from: AS NOTED MONDAY 8:00AM BEGIN THE CLEAN-UP DF THE ROOF AREA OF THIS PREMISE. WORK ALSO BEGINS ON THE ROOF OF IS DUTCH STREET. FOR THE PURPOSES OF AIR MONITORING THE PEOF AREAS OF THESE TRIO BUILDINGS WOIL BE TREATED AS ONE WORK AREA. THE REMOTE DECON UNIT FOR THIS WORK IS ON THE ROCF OF I5 DUTCH STREET. ALR SAMPUNC WILL BE PERFORMED BU SOHN BOYD CCERTIFICATE # AM 90-05530 EP 01/03) OF WARDEN & PANZER ENGINEERS. TUESDAY 8:00AM THUPSDAY 7:00PM JUNE 25 WORVERS BEGIN THE WEST FACADE CLEANUP OF THIS PREMISE. THE ROOF PORTION OF THIS PROSECT HAS BEEN COMPLETED. AIR SAMPUNG WIL BE PERFORMED BY JOMN BOrD. JUNE 21 2002 I CONDUCT A VISUAL INSPECTION OF THE CUEANED WORK AREAS : ALONG WITH JOMN BOYD OF WARREN & PANZER ENGINEERS. NO VISIBLE WTC DEBRIS WAS OBBERVED. SATURDAY 7:00AM JUNE 29 2002 WORKERS CONSTRUCT DYKE ON THE SIDEWALK TO COUECT WATER RUN-OFF PROM THE FACADE CUEAN UP. THE FACADE CLEANUP OF IS DUTCH STREET WIl BE DONE SIMULTANEOUSLY. FOR THE PURPOSES OF ALR SAMPLNG THE FACADES OF THESE TWO BUELDINES LIL BE TREATED AS ONE WORK ArEA. 4:00 PM FACADE CUEAN-UP IS COMPLETE, NO VISIBLE DEBRIS WAS OBSERUED ON THE CUEANED SURFACES. THE PROVECT AT THIS POEMISE IS NOU COMPLETE. NYC-WTC_000130759

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000130759Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →