NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 01/37-39 JOHN STREET
Document / 2 pages

37-39 JOHN STREET

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000092836–000092837
Page image
Scanned page image, NYC-WTC_000092836
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 12-78 NASSAU STREET AKA 38-39 JOHN STREET Floor Zip Borough ROOF & FACADE 10038 1 Inspector Building Type Dennis Antzoulatos Contractor's Name COMMERCIAL Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 Contact Person (212) 922-0077 Block 78 Inspection Date: AS NOTED Squad # Badge # N/A : Lot 35 Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name A020 Photos Taken Yes? No Address City State Zip Phone Time of Inspection from: As NOTED MONDAY NOVEMBER 4 2002 THE CUEAN UP OF THE EAST FACADE AND METAL WORK ON THE ROOF oF THE PREMISE BEGAN. WORIERS WORE DOUBLE PROTECTIVE SUITS AND UMLIZED STEP oFF PADS, NO DECONTAMINATION UNIT WAS ERECTED. AlR FOR THIS PORTION OF THE CLEAN UP WAS PERFORMED BY CELESTINE NMORMA ( CERTIFCATE * AH 0208495 érp 04/03) TUESDAY NOVEMBER S 2002 THE CLEAN UP OF THE EAST FACADE WAS COMPLETED. THE CUEAN UP OF THE NOVEMBERE 9-10 2002. AND THE METAL WORK ON THE RODF SOUTH AND WEST FACADES IS SCHEDIED WEDNESDAY NOVEMBER 6 2002 I CONDUCT À VISUAL INSPECTION OF THE CUANED SURFACES AND ORDERED A MINOR RE CLEANING OF METAR WORK ON THE RODF. AY THE CONCLUSION DE THE RE CUEANING ACTIVITIES, I PE-INSPECTED THE METAL WORK AND I CBSERVED NO VISIBLE WTC DEBRIS. NO VISIBLE DEBRIS WAS OBSERVED ON THE EAST FACADE SURFACES. SATURDAY NOVEMBER O 2002 THE CUEAN UR OF THE WEST FACADE (NASSAU STREET SIDE) WAS CONDUCTED TODAY. 600 AMi WORKERS ABRNE AT THE JoBSITE 630 AM: CONSTRUCTIÓN OF PLASTIC DYKE (TO COUECT RUN OFE WATER) BEGINS. 800 AM : CONSTRUCTION OE DYKE COMPLETED. PLASTCIZING OF STORE FRONTS BEGINS 900 AM: STORE FRONTS MAVE BEEN PLASTICIZED. AIR SAMPUNG BEGINS. Ale SAMPUNG EQUIPMENT IS SET UP ON THE OPPOSITE SIDEWALK. AIR SAMPUNG IS PERFORMED ET FESTY OSEMWEGIE (CEFTIFICATE # AH 01-01030 ERP 01|03) OF WARPEN & PANZER ENGINEERS VACUUMING OF BUHE DEBRIS FROM WINDOU LEDGES BEGINS. A DECONTAMINATION TRUCK IS UTTUTED FOR WORKER DECONTAMINATION. NYC-WTC_000092836

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000092836Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →