NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 34/86 NASSAU STREET 1001202, 78/40
Document / 15 pages

WTC debris inspection form, 86 Nassau Street

Machine-extracted title · confidence 95%

Form documenting facade conditions and ACM presence for a building at 86 Nassau Street.

NYC-WTC_000099325–000099339

Folder label: “86 NASSAU STREET 1001202, 78/40

Page image
Scanned page image, NYC-WTC_000099329
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. Inspection Date: 86 NASSAU STREET Zip Borough ROOF FACADE Inspector Dennis Antzoulatos Building Type COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Block 18 Lot 40 Squad # N/A Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name HBS EQUITIES LLC Address City |Badge # A020 Photos Taken Yes/ No State Zip Phone (212) 965-0241 Time of Inspection from: AS NOTED TUESDAY JuLy 2 2002 8:00 Am 8:30 AM 1:00PM 1:00PM 4:00PM 5:00PM WOEKERS BRINE MATERIALS TO THE JOBSITE WORKERS BEGIN CLEAN UP ACTIVITIES ON THE ROOF OF THE PREMISE AS PERE THE APPROVED SCOPE OF WORI. WORKERS BREAK FOR LUNCH. AIR SAMPUNG IS BEING PEZFORMED BI LUIS SOTO OF WARDEN & PANZER ENGINEERS WORKERS RESUME WORK. WERKERS HAVE COMFLETED THE CUEAN UP OF THE ROCF AND BEGIN BAG-OUT ACTIVITIES BAG-OLT ACTIVITIES COMPLETED. NE VISUAL WTC DEPRIS WAS OUSERUED CLEANTUP OF WEST, EAST AND NORTH FAADES SCHEDULED FOR JULY 14, 2002. SUNDAY JULY 14, 2002 T:00AM WERKERS BEGIN THE CONSIRUCHION DF OIKE TO COLECT WATETZ FROM FACADE CLEANUIS THE FACADE CUEANUP CF E8, EG/ AND EG NASSAU ST. WIK OCEUE SIMULTANEOUSLY AND WiK BE TREATET AS ONE WOLI AREA FOR THE PURPOSES OF AIR MONITORING 9:00AM 10:30 AM. DYKE MAS BEEN CONSTRUOTER. A MOBILE DECON TRUCK WILL BE USED. WORKERS BEGIN VACUUMING BULK MATEEIAL FROM THE FACADE, FESIY OSEMWEGIE OF WARREN & PANZER BERINS ALE SAMPUNG. FIVE AiR SAMPLES WILL BE PUN. VACUUMING COMPLETED. WORIERS BREAK FOE LUNCH. WASHING OF FACADE BEGINS WASHINC CF FACADE COMPLETED I CONDUCT A UEUAL INSPECTION OF THE CIEANET FACADES AND CBSERNE NO VISIBLE WTC DEBRIS 5:10 PM 6.00PM NORXETS DISMANTE DYKE. THE CEAN UP PROJECT AT THIS LOCATION IS NO CONPETE. WORKERS LEANE THE WORK SITE. NYC-WTC_000099329

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000099329Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →