NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 34/88 NASSAU STREET 1001204, 78/42
Document / 8 pages

License agreement for exterior clean-up, 2002

Machine-extracted title · confidence 95%

Agreement between DEP and landowners at 88 Nassau Street for the removal of foreign debris.

NYC-WTC_000099254–000099261

Folder label: “88 NASSAU STREET 1001204, 78/42

Page image
Scanned page image, NYC-WTC_000099260
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • Asbestos Inspection Report '. Premise No. 88 Zip RoOF FACADE Inspector Dennis Antzoulatos NASSAU STREET Borough 1 Building Type COMMERCIM Contractor's Name Benjamin Kurzban & Son Control Address A2dirRalph Avenue, Brookiyn State Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 StreetNew York State Zip Phone NY 10017 (212) 922-0077 Contact Person GuyA.PLUSH (212) 285-4232 TUESDAY JULY z 2002 Block 78 Inspection Date: AS NOTED Lot Squad# Badge # 42 N/A A020 Basis of Inspection Photos Taken WTC Survey Yes/No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name MICHAEL PILDES ET AL Address City State Zip Phone Time of Inspection from: A5 NOTED 8:00AM 8:30Am 12:00PM 1:00PM 4:00PM 5:00PM WORKERS BRING MATERIALS TO THE JOBSITE. WORKERS BEGIN CUEAN UP ACTIVITIES ON THE ROOF OF THE PREMISE AS PER THE APPROVED SCOPE OF WORK. CORRERS BREAK FOR LÚNCH, AiR SAMPLNG IS BENG PERFORMED BY LUS SOTO OF WARDEN & PANZER ENGINEERS WORKERS RESUME WORK. WORKERS HAVE COMPLETED THE CIEAN-UP OF THE RCOF AND BEGIN BAG-OUT ACTIVITIES. BAG-OUT ACTIVITIES COMPLETED. NO VISUAL WTC DEBRIS WAS OBSERNED CLEAN-UP OF WEST, EAST AND SOUTH FACADES SCHEDULED POR JULY 1A, 20012. SUNDAY JULY 14, 2002 1:00aM WOORKERS BEGIN CONSTRUCTION OF DYKE TO COLLECT WATER FROM FACADE CIEAN-UPS. FACADE CLEAN UP OF 88,86Y2 AND 86 NASSAN WIL OCCUR SIMULTANEOUSLY AND WIL BE TREATED AS ONE WORK AREA FOR THE PURPOSES DF AIR MONITORING 9:00 AM 10:30 AM DYRE MAS BEEN CONSTRUCTED. A MOBILE DECON TRUCK WIn BE ÜSED WORKERS BEGIN VACUUMING BULK MATERIAL FRCM THE FACADE, FESTY OSEMWEGIE OF WARDEN & PANZER BEGINS AIR SAMPUNG. FIVE AIR SAMPLES WIL BE RUN 12:00PM VACUUMING COMPLETED. WORKERS BREAK FOR LUNCH. WASHING OF FACADE BEGINS OF FACADE COMPLETED 4:00PM- 5:00PM I CONDUCT VISUAL INSPECTION DF THE CUEANED FACADES AND OBSERUE NO VISIBLE DEBRIS WORKERS DISMANTE DYKE, THE CIEAN UP PROJECT AT THIS PREMISE IS NOW COMPLETE. EiCCPM WORKERS LEAVE THE WORKSITE. NYC-WTC_000099260

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000099260Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →