NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 01/37-39 JOHN STREET
Document / 11 pages

Pest control invoice, Benjamin & Son Control, Nov 2002

Machine-extracted title · confidence 95%

Invoice from Benjamin & Son Control to DEP dated November 12, 2002 for contract work.

NYC-WTC_000092819–000092829

Folder label: “37-39 JOHN STREET”

Page image
Scanned page image, NYC-WTC_000092826
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • - Asbestos Inspection Report Premise No. 12-18 NASSAU STREET AKA 31-39 JOHN STREET Floor Zip Borough ROCF $ FACADE 10038 Inspector Dennis Antzoulatos Building Type COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person TBlock Inspection Date: AS NOTET Lot Squad # Badge # 35 N/A A020 Basis of Inspection Photos Taken WTC Survey Yes No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: As NOTED MONDAN NOVEMBER 4 2002 THE CUEAN UP OF THE EAST FACADE AND METAL WCRK ON THE ROOF OF THE PREMISE BEGAN. WORKERS WORE DOUBLE PROTECTIVE SUITS AND UTUZED STEP OFF _PADS. NO DECONTAMINATION UNIT WAS ERECTED. Aie SAMPUNE FOR THIS PORTION OF THE CIEAN UP WAS PERFORMED BY CELESTINE NMORMA (CERTIFCATE * AH 0208495 éxp 04/03) TUESDAY NOVEMBER S 2002 THE CLEAN UP OF THE EAST FACADE AND THE METAL WORK ON THE BODF WAS CAMPLETED. CLEAN UP OF THE SOUTH AND WEST FACADES IS SCHEDUED FOR NOVEMBER 9-10 2002, WEDNES DAY NOVEMBER E 2002 I CONDUCT À VISUAL INSPECTION OF THE CUEANED SURFACES AND ORDEREDA MINOR RECIEANING OF SOME METAL WORK AN THE ROOF. AT THE CONCUSION OF THE RE CUEANING ACTIVITIES, I DE-NSPECTED THE METAL WORK AND I OBSERVED NO VISIBLE WIC DEBRIS. NO VISIBLE DEBRIS WAS OBSERVED ON THE EAST FACADE SURFACES. SATURDAY NOVEMBER 9 2002 THE CUEAN VP OF THE WEST FACADE (NASSAU STPEET SIDE) WAS CONDUCTED TODAY. 600 AM i WORKERS ARRIVE AT THE JOBSITE 630 AM: CONSTRUCTION OF PLASTIC DYKE (TO COUECT PUN CFF WATER) BEGINS. 800 AM: CONSTRUCTION OF DYKE COMPLETED. PLASTICIZINGI OF STORE FRONTS BEGINS 900Am: STORE FRONTS HAVE BEEN PLASTICIZED. AlR SAMPUNG BEGINS. Ale SAMpuNG EQUIPMENT IS SET UP ON THE OPPOSITE SIDEWALK. ALR SAMPUNG IS PERFORMED EY FESTY OSEMWEGIE (CERTIFICATE# AH 01-01030 ERP 01/03) OF WARPEN É PANZER ENGINEERS VACUUMING UF BUUE DEBRIS FROM WINDOW LEDGES BEGINS. A DECONTAMINATION TRUCK -IS UTIUITED FOR WIEKER DECONTAMINATION. NYC-WTC_000092826

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000092826Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →