Asbestos Inspection Report
Premise No.
29
PARE
Fow
Floor
Zip
ROOF $ FACADE
10038
Inspector
Dennis Antzoulatos
Borough
Building Type
COMMERRIAL
Contractor's Name
Benjamin Kurzban & Son Control
Address
City
1248 Ralph Avenue, Brooklyn
State
Phone
NY
11236
(718)531-2900
Laboratory Name
Warren & Panzer Engineers Inc.
Address
City
228 East 45 Street
New York
State
Zip
Phone
NY
10017
(212) 922-0077
Contact Person
Inspection Date:
As NoTeD
Block
Lot
Squad #
Badge#
90
Basis of Inspection
N/A
A020
Photos Taken
WTC Survey
Yes/(Ño
Sample Number
N/A
Sample Number
N/A
Sample Number
N/A
Owner's Name
Address
City
State
Zip
Phone
Time of Inspection from:
As NOTED
MONDAY NOVEMBER 18 2002 TD TUESDAY NOVEMBER 19 2002
THE CUEAN UP
eF THE
OF THE PREMISE WAS CONDUCTED.
AIR SAMPUNG FOR THIS PORTION OF THE
CUEAN UP WAS PERFORMED BY
BEDIN (CERTIFICATE * AH 96-1494T EXP 02/03) OF WARCEN $ PANZER ENGINEERS
AIR SAMPUNG EQUIPMENT WAS SET UP
ON THE ROOF IN AN AREA CUISIDE THE
"ACTIVE CLEAN UP" AREA LIE. SAMPUNG EQUIPMENT SET UP GF THE WESNERN HMF OF
THE ROOF FOE THE CUEAN UP OF THE EASTERN HALF OF THE ROOF). DUE TO SPACE
UMITATIONS WORKERS WORE DOUBLE PROTECTIVE SUITS AND UTILZED STEP OFF PADS
IN LIEU OF PEMOTE DECONTAMINATION FACILITIES.
AT THE CONCUUSION OF THE
CLEAN UP ACTIVITIES A VISUAL INSPECTION LiAS CONDUCTED Bi YURI BEDIN, NO VISIBLE
WTE DEBEIS WUAE OBSERNED.
THURSDAS
_NOVEMFEER 21 2002
(0T00AM - 1200 NOON)
HANGING SCAFFOLD LOAS ERECTED ON THE WESI FACADE OF THE PREMISE.
DUE TO LARGE CCACKS IN THE BUILDING'S FACADE SURFACES, CRACHED WINDOUSS,
LOOSE CORNICES AND COPING STONES, MODIFIED CUEAN UP PROCEDURES WILLL BE
EMPLOYED.
BULLOING FACADE SURFACES WILL BE HEPA VACUUMED AND WET
WIPED ONL. POWERWASHINE DF THE FACADE SURFACES WILL NOT BE DONE
A PEASONABLE ATTEMPT WILL BE MADE TO ACCESS DEBRIS LODGED IN THE
DAMARED BULDING FACADE SURPACES.
FRIDAR NOVEMBE 22 2002 (0100A-0700PM)
THE CUEAN UP OF THE WEST AND EAST FACADES DF THE PREMISE
WAS CONDUCTED. AIR SAMPUNE
FOR THIS PORTION OF THE CUEAN UP WAS
PERFORMED BU CELESTINE NMORKA (CERTIFICATE I AH 0Z-0B495 EXP 04/03) oF
WARREN i PANZER ENGINEERS.
AlR SAMPUNG EQUIPMENT WAS SET UP ON THE
WESTERN SECTION OF THE ROOF FOR THE WEST FACADE CIEAN UP AND ON THE
NYC-WTC_000115549
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000115549Source: NYC Law Department, mirrored locally
Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.