NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No.
Floor
ROOF $ FACADE
Zip
10038
Inspector
Dennis Antzoulatos
90 FULTON STREET
Borough
1
Building Type
MIXED
USE
Contractor's Name
Benjamin Kurzban & Son Control
Address
City
1248 Ralph Avenue, Brooklyn
State
Zip
NY
Phone
11236
(718)531-2900
Laboratory Name
Warren &Panzer Engineers Inc.
Address
228 East 45 Street
City
New York
State
Zip
Phone
NY
10017
(212) 922-0077
Contact Person
Block
77
Inspection Date:
As
NOTED
Lot
Squad#
Badge #
23
N/A
Basis of Inspection
WTC Survey
A020
Photos Taken
Yes/NO
Sample Number
N/A
Sample Number
N/A
Sample Number
N/A
Owner's Name
Address
City
State
Zip
Phone
Time of Inspection from:
As NOTED
THURSDAY SEPTEMBER 26 2002
THE CUEAN UP OF THE RODF OF THE PREMISE BEGAN TODAY
THE CLEAN UP
OF THE ROCE OF
THE ADLACENT PREMISE WAS CONDUCTED
SIMULTANEOUSLY (OZ FULTON STREET). FOR THE PURPOSES OF AIR SAMPLNE
THE RODE AREAS OF THESE TWO BUILDINGS WERE TREATED AS ONE
WORK AREA
AIR SAMPUNG FOR THIS PORTION OF THE CUEAN UF CAS
PERFORMED BU FESTY OSEMWEGIE (CERTIFICATE # AH 01-01030 EP 01/03)
FRIDAY SEPTEMBER 21 2002
TRE CUEAN UP OF THE RODF OF THE PREMISE AND THE ADJACENT PREMISE (92
FULTON STREET) WAS COMPLETED TODAN. AIR SAMPUNG FOR THIS PORTION OF THE CUEAN UP
WAS PERTORIED BY FESTY OSEMWEGIE, THE CUEAN UP OF THE REATZ (SOUTH) FACADES WAS
PERFORMED TODAY.
ALR SAMPUNG TOR THE RERR FACADE CUEAN UP WAS PERDORMED BY
LERSON GARCIA (CERTIFICATE# AH-01-11633 ERP 03/03) OF WARDEN $ PANZERI
SATURDAY SEPTEMBER 28 2002
THE CUEANUP OF THE SET BACK ROOF AREAS OF 92FULTON AND D0 FULTON WERE
CONDUCTED. FOR THE PURPOSES OF ALD SAMPUNG THE SETBACK AREAS OF BOTH BUILDINGS
WERE TREATED AS OUE WORK AREA, ALR SAMPLING FOR THIS PORTION OF THE CUEANUP
WAS PERTORMED BU FESTY OSEMEGIE AND IDRIS IDOCNY /CERTIFICATE # AH 02-11201 ERP 05/03 )
SUNDAY SEPTEMBER 29 2007
THE CUEAN UP OF THE NORTH (FRONT FACADE OF THE PREMISE AND THE ALLCENT PREMISE (92
FULTON ST) WAS CONDUCTED. A BOOM TRUCK WAS USED TO ACCESS FACADE SURFACES. A DECON TRUCK COAS
UTILZED. A PLASTIC DKE WAS CONSTRUCTED TO COLECT WATER RUN OFF. ALR SAMPLING WAS PERFORMED BY
FESTY OSEMWEGIE. AIR SAMPLES WERE SET UP OU THE OPPOSITE SIDEWACK, ALL CLEANED WORK AREAS
WERE INSPECTED AND NO VISIBLE LUTC DEBRIS WAS OBSERVED. THE CUEAN UP PROJECT IS NOLU COMPLETE
ol.
NYC-WTC_000127534
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000127534Source: NYC Law Department, mirrored locally
Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.
Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.