Asbestos inspection log, 83 Maiden Lane, Sept 2002

Machine-extracted title · confidence 95%

Daily inspection log documenting roof cleanup activities and air sampling at 83 Maiden Lane from September 4-7, 2002.

NYC-WTC_000102444

Folder label: “83 MAIDEN LANE 1001111, 68/7

Page image
Scanned page image, NYC-WTC_000102444
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document : Asbestos Inspection Report Premise No. Floor ROOF Zip 10038 Inspector Dennis Antzoulatos 833 MAIDEN LANE Borough 1 Building Type COUMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block 68 Lot Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name (Inspection nerer Squad # Badge# N/A A020 Photos Taken Yes(No) Address City State Zip Phone Time of Inspection from: WEDNESDAY SEPTEMBER 4 2002 CONTRACTOR BRINGS MATERIALS TO THE WORKSITE. THURSDAY SEPTEMBER 5 2002 THE CIEAN UP PROJECT ON THE RODF OF THE PREMISE BEGINS. A RENOTE DECONTAMINATION UNIT IS CONSTRUCTED IN THE HALWAY AREA LEADINGI TO THE RODF. AIR SAMPUNG IS PERFORMED BY JERSON GARCIA ICERMIFICATE # AH 01-11633 EXP 03/03) OF WARREN $ PANZER. FRIDAY SEPIEMBER 6 Z00Z PORTION DF THE CUEAN-UP IS PERFORMED B4 FeSTY OSEMWEGIE ICERTIFICATE # AH 01-01030 EXP O1lO3). CUEAN UP OF THE IITU FIOOR SET- BACK AND THE CIEAN UP OF TWO WINDON LEDGES ON THE STH FLDOR IFACING GOLD STREET ) WIG BE DONE TOMORROLI. MINOR RECUEANING ON THE PODF UuL ALBO BE COMPLETED ON SATUPDAN. SATUROAY. SEPTEMBER 1 2002 THE CUEAN UP OF THE lITH FLODR SET-BACK IS COMPUETED, WORRERS DOUBLE-SUIT AND USE STER OFF PADS IN LIEU OF A REMOTE DECON. THE STH FLGOR WINDOW LEDGES ARE CUEANED FROM INSIDE THE BULDING. THE Il TH FLOOR AND THE STH FLODR ARE CURRENTLH UNOCCUPIED AREAS. CONDUCT A VISUAL INSPECTION DE THESE TWO WORK ARENS AND OBSERNE NO VISIBLE CUTO DEBRIS AT THE CONCLUSION OF THE CUEANING ACTIVITIES. THE CUEAN UP PROIEO AT THE PREMISE IS NOCO COMPLETE. NYC-WTC_000102444

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102444Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

WTC site personnel sign-in sheet · Box DEP Box 01

NYC-WTC_000094348

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

4 shared non-person entities · 1 shared topics · similarity 0.980

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →